Join today and be a part of the fastest growing B2B Network Join Now

Light Weight Space Frame Coal Storage Shed for Power Plant

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 40 working days after confirming construction drawings
  • Min Order: 200

Supplier Info.

  • Employees Total 101-200
  • Annual Revenue Above US$100 Million
Item
Specification
Structural Type
Longitudinal Space Frame Structure
Main Frame
Steel Pipe
Q235 / Q355 Steel
Bolt Ball
45# Steel
Sleeve
Q235 & 45#
High Strength Bolt
40Cr
Secondary Frame
C-Purlin / Z-Purlin
Q235 / Q345, 250g/m2 galvanized layer, no painting on the surface
Enclosure System
Roof Panel
Color Steel Panel / Al-Mg-Mn Panel(The colors&sizes of all panels can be customized as required.)
Accessory Structure
Door
Rolling Door / Sliding Door
Lighting System
FRP / PC / Window
Ventilation System
Louver / Ventilator
Drainage
Free Drainage
Others
Design Standard
American Standard / European Standard / Chinese Standard
Design Lifetime
Above 50 years
Fabrication
ISO Quality Control
Surface Treatment
Blast Cleaning Sa2.5 level, painting or galvanizing(The thickness can be customized as required.)
Packing
Metal Frame for Large Components, Wooden Case or Metal Case for Small Components.Or Bundling
Installation
Installation Guide
TL commit to delivering cost-effective, customized steel building solutions that address and surpass our clients' expectations.Our rich project experience enables us to speed up the design and detailing process by eliminating overlapping tasks and working with an efficient integrated workflow.
Easy & Fast Installation

Installation Steps of Longitudinal Space Frame
1) Half arches are pre-assembled on a project
2) Half arches will be joined together to form a rib
3) Half arches are joined together to form a rib
4) Assembly in air
Premium Services
Get Targeted Quotations
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1