Join today and be a part of the fastest growing B2B Network Join Now

Prefabricated Steel Warehouse Buildings

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 35 days after deposite
  • Min Order: 100

Supplier Info.

  • Employees Total 501-1000
  • Annual Revenue US$10 Million - US$50 Million

Project name: Prefabricated Steel Warehouse BuildingsLocation: Colon, PanamaArea: 9500 m2Project time: 2016

Prefabricated steel warehouse buildings details:

1. Main structure: welded H section steel with primer and facing anti-rusting painting

2. Engineered steel building secondary framing: Galvanized C & Z Purlin, Tie Bar, Roof and Wall Support are formed as secondary frame

3. Roof maintaining: 150mm thick rock wool sandwich panel

4. Wall maintaining: 150mm thick rock wool sandwich panel

5. Door: Rolling Shutters with steel canopy

Service: we supply designing, fabrication, and erection of prefabricated steel warehouse buildings

Premium Services
Need Suppliers
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok