We have three layer pipe coating Plant . We are coating from dia 4â?? to 48â?? at our coating plant. Now we intend to install sric aclant and internal epoxy coating plant. An oven would be required for pre heating of pipes prior to sric aclant. Our coating conveyor consists of 32 pair of wheels. One Show More...
We have three layer pipe coating Plant . We are coating from dia 4â?? to 48â?? at our coating plant. Now we intend to install sric aclant and internal epoxy coating plant. An oven would be required for pre heating of pipes prior to sric aclant. Our coating conveyor consists of 32 pair of wheels. One of each pair has an electric motor with reducer gear. Each wheel is fitted in two bearing, which is mounted on a frame , which is mounted on a turn table.