Join today and be a part of the fastest growing B2B Network Join Now

Green Formwork-TB Beam-Beam Drophead System Slab Formwork Early Stripping Slab Formwork Shoring System Concrete Formwork Panel Formwork Scaffolding Steel Prop

  • Origin: China
  • Supply Type: in stock
  • Processing Time: 35days
  • Min Order: 300

Quick Details

Main Beam Alumiunm
Secondary Beam Aluminmun/Steel beam
Finishing Powder coating

Supplier Info.

  • Company Name Table Concrete Formwork & Shoring (Shaanxi) Co.,Ltd
  • Membership:Free
  • Business Type: Manufacturer, Trading Company, Buying Office, Agent, Distributor/Wholesaler, Government ministry/Bureau/Commission, Association, Business Service (Transportation, finance, travel, Ads, etc), Other
  • Employees Total
  • Annual Revenue

TB Beam-Beam droad system formwork is compose of aluminum beam, steel secondary beam, droad and cantilever frame. The specification of main beam and secondary beam can meet the requirements of the space among the uoright tubes of all shoring system in the market at presents, it works with all kinds of scaffolding such as ADG Scaffolding (French), Disc Scaffolding (Germany), Cuplock scaffolding, wheel scaffolding , Keyway Scaffolding, Cuplock Scaffolding, etc. Early droad is used in 48 and 60 upright tubes. Main beam, Secondary Beam and plywood are stripped by early droad system.

Al Alloy Main Beam:

Secondary Beam Option1 (Steel profile)

Secondary Beam Option2 ("Î "type steel beam with wood)

Site tos:

Premium Services
Need Suppliers
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok