Join today and be a part of the fastest growing B2B Network Join Now

Electronic Taxi Meter PCB Printed Circuit Board- One Stop Solutions PCB To PCBA

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 10-15 days
  • Min Order: 5

Supplier Info.

  • Employees Total 101-200
  • Annual Revenue

Supplier:Grande Electronics

Layers:4

Application:Â Electronic Taxi Meter PCB Printed Circuit Board- One Stop Solutions PCB To PCBAÂ

PCB:FR4/1.6mm/1oz Min Via:Â 0.2mm

Surface Treatment:Â HASL

PCBA Lead time:Â 3-4 weeks

Testing:Â 100% E-test

Standard Warp:<0.75%

Â

[Description]

1, Turnkey solution for Electronic Taxi Meter PCB Printed Circuit Board- One Stop Solutions PCB To PCBA

2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.

3, Â Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).

4, SMT&DIP&PTH&BGA.

5, Components Sourcing.

6, Quick PCBA prototype.

7, X-ray test, ICT and Functional Circuit Test.

8, Sample and small batch order are accepted.

PCBA Service Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.

Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

Â

PCBA Quality Assurance

1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008Â

2, 7 t-proof SMT DIP >

3, All s wear anti-static and dust-proof clothing.

4, All operators should pass strictly training before they start work.

5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP

6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.

7, PCBA Test:ICT, Functional Circuit Test and X-ray test.

8, Package Processed: 0402, 0603, 0805, 1206, 1608, 2125, 3216 Micro QFP 0.2mm Flip-chip, BGA, Connectors BGA Ball Pitch=0.2mm

9, Each workstation in accordance with the SOPÂ

10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.

11, Material Brand:KB, SHENGYI, NANYA and so on.Â

PCBA Lead Time PCBA prototype: 7-10 working days after contract signed and EQ confirmed.Â

Mass production: partial delivery according to the customer’s requirement.

Â

Other information for PCBA

1, The mass production will be arranged after PCBA prototype confirmed.Â

2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.

Â

Premium Services
Tell us your Requirement
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok