Join today and be a part of the fastest growing B2B Network Join Now

Advanced Driver Assistance Systems (ADAS) In Contract PCB Assembly- Smart Car System

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 10-15 days
  • Min Order: 5

Supplier Info.

  • Employees Total 101-200
  • Annual Revenue

Supplier: Grande Layers: 6

Application:Â Advanced Driver Assistance Systems (ADAS) In Contract PCB Assembly- Smart Car Systems

PCB:FR-4/1.6mm,1oz finished copperSurface Treatment:Â ENIG

PCBA Lead time: 3-4 weeksPacking: Anti-static bag and compartmental packingStandard Warp: <0.75%

Â

[Description]1, Turnkey solution for Advanced Driver Assistance Systems (ADAS) In Contract PCB Assembly- Smart Car Systems

2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.3, Electronic Contract Manufacturing.4, SMT&DIP&PTH&BGA.5, Components Sourcing.6, Quick PCBA prototype.7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)8, Sample and small batch order are accepted.PCBA ServiceCustomer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.PCBA Quality Assurance1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 2, 7 t-proof SMT DIP >3, All s wear anti-static and dust-proof clothing.4, All operators should pass strictly training before they start work.5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.7, PCBA Test:ICT, Functional Circuit Test and X-ray test.8, Package Processed:0402, 0603, 0805, 1206, 1608, 2125, 3216Micro QFP 0.2mmFlip-chip, BGA, ConnectorsBGA Ball Pitch=0.2mm9, Each workstation in accordance with the SOP 10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.11, Material Brand:KB, SHENGYI, NANYA and so on. PCBA Lead TimePCBA prototype: 7-10 working days after contract signed and EQ confirmed. Mass production: partial delivery according to the customer’s requirement.Other information for PCBA1, The mass production will be arranged after PCBA prototype confirmed. 2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.3, EPE is used to avoid impact and crash.PCBA Standard PackingAnti-static bag and compartmental packing

Â

Premium Services
Tell us what you need
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok