Join today and be a part of the fastest growing B2B Network Join Now

Silicone o ring gaskets bonding press machine

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 2-3 days
  • Min Order: 1

Supplier Info.

  • Employees Total 101-200
  • Annual Revenue

Bonding Press Machine for Silicone O Ring Gaskets

【Product Description】

The silicone extrusion gaskets bonding machine ES-001 is designed for bonding the silicone extrusion gaskets &tubings into o ring Shapes.With the help of htv silicone adhesives(Available from us) , The extrusion profiles reach a permanant bond in 8-15 seconds with temperature around 175 degrees ,Bonding time and temerature at your adjustment ,Fast working efficiency.

silicone to silicone

【Technical Data】

Model No.: ES-001

Mold Material : Copper

Upper Mold size: 40*80*13mm(Mold Thickness Ajustable)

Down mold size : 40*80*13mm(Mold Thickness Adjustable)

Copper Mold Temperature Range:0-400℃

The Fast working frequency:1000 times/hour

Working Air Pressure: 4-6bar

Power Input: AC220V 1200W

Net weight: 20KGS

Input Pressure: 6KG, Maximum pressure :40KG

Machine Size: L400*W300*H400mm

【Product Advantage】

1, Fast and Efficient Bond & Increase Productivity of Silicone O Rings .

silicone o ring bonding .jpg

2, The Copper mold is detachable from the original heat mold

3, Mold opening service is available from us based on your silicone profile sizes for standard square and round shape.

Square copper

2, Preheat by pressing the silicone gaskets ends against the hot copper mold for 2-3 second for a more strengthened bond.

3, Dipping the two silicone gaskets ends with silicone adhesive on the PET Sheet .

4, Place the silicone gaskets in the copper mold and press the silicone gaskets ends joining together to secure they well for good bond.

bonding silicone O ring secure JPG

【Packing】

Wooden Case Packing ,1~5 Set/Case (Gross Weight Around 25kgs For One Set)

【Safety Note】

1: Please read carefully the manuals before operating the machine, and new operators must pass job training tests.

2: Please check the power plug and air plug and confirm both have been connected correctly. Make sure that the earth ted reliably with the device’s body, and check all components that have been installed firmly.

3: In the operation, operating the same machine at the same time by two or more people is banned.

4: In the event of abnormal operation should immediately turn off the air supply firstly, then shutting down power switch. After that, the professionals must check and treat the machine.

5:Pull off the air pressure tube and shut down all the power while the machine not working also turn off the power while you have to change the mold in case of touching electricity.

【Routine Maintenance】

To extend service life, please maintain the equipments and confirm that they are in good condition, mainly depending on the following rules:

1: Environment: keep the working environment clean, without dust

2: Power: stable power supply, if not, voltage stabilizer will be necessarily installed on the machine.

3: Air supply: Keep the compressed air clean, without any dust, and let out the polluted water from the filtering cup regularly.

4: Keep the equipments clean, and confirm the moving part without dust interference. If not using the machine for a long time, please coat rust-proof oils on the adjusting screw rod, pack it well and arrange it properly.

5: Add the lubricating oil on the moving part of the equipment.

6: Before bonding tubes, please check the pressure and temperature of upper and lower copper-formed mould, and ensure its bonding groove clean

Premium Services
Get Targeted Quotations
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok