Core Material | Glass wool |
Density | 65kg/m3 |
Core Thickness | 50mm, 75mm, 100mm, 120mm |
Steel Paint | PE /Fvdf /HDP/ SMP |
Application | Hotel, Villa, Apartment, Office Building, Hospital, School, Mall |
Product Introduction
In order to meet the insulation requirement of buildings, Wiskind has launched the high-quality glass wool sandwich composite panel. The product uses high-quality glass wool as the core material. Through the super long precision double-track curing, the product is exnt in terms of fire prevention, thermal insulation, noise reduction and environmental protection.
Product Parameters
Brand of steel plates | Bao Steel, Yieh i Steel, Ma Steel, BHP Steel. |
Painting of steel plates | PVDF, SMP, HDP, PE; The top painting should be above 25μm. |
Galvanized layer of steel plates | Exterior plate:55% Aluzinc above 100g/m³or Zinc coating above 150g/m³; Inner plate:55% Aluzinc above 70g/m³or Zinc coating above 100g/m³. |
Thickness of steel plates | 0.14mm-0.6mm. |
Thickness of core | 50mm/75mm/100mm/120mm/150mm. |
Density of core | 64kg/m³ |
Effective width | 950mm/1150mm |
Panel Length | According to customersâ request |
Performance Description
1.Thermal Insulation: The low coefficient of heat conductivity and the exnt node design guarantee the sealing performance and the thermal insulation effect. 2.Sound Insulation: The sound absorption effect is good. The sound reduction factor is no less than 30dB. It can effectively reduce the interference of outside noise. 3.Solid: The panel has high strength, unique double-support plug interface design and strong capacity in wind pressure resistance. It has strong strength to resist pressure and bearing, which can used as exterior protected construction and load-carrying construction. 4.Beautiful Design: Bright in color and attractive in appearance, there is no need to make the outer ornament. The panel adopts hidden-screw node design and has diversified panel effects. 5.Convenient Installation: Easy, flexible and fast. Compared with civil construction, it can cut down over 40% construction period.