Quantity(Sets) | 1 - 1 | |
Est. Time(days) | 40 |
METO Semi-aotumatic 3-3 4-4 beer bottle filling and Capping Machine
Capacity: 100-800 bottles/hour Voltage: customization Applicable bottles: 300ml-2000ml
Semi-aotumatic beer bottle filling and Capping Machine | ||||||||||
Type | SABF4 (no capping) | SABF4-4 | SABF6-6 | SABF8-8 | ||||||
Beer working pressure | 0.15-0.20MPa | 0.15-0.20MPa | 0.15-0.20MPa | 0.15-0.20MPa | ||||||
Bottle Type | 300ml 500ml | 300ml 500ml | 300ml 500ml | 300ml 500ml | ||||||
Filling Part With Flowmeter Or Not | No | No | No | No | ||||||
Air Regulator | 0.55-0.65MPa | 0.55-0.65MPa | 0.55-0.65MPa | 0.55-0.65MPa | ||||||
CO2 Regulator | 0.15-0.2MPa | 0.15-0.2MPa | 0.15-0.2MPa | 0.15-0.2MPa | ||||||
Beer Source Pressure | 0-0.1MPa | 0-0.1MPa | 0-0.1MPa | 0-0.1MPa | ||||||
Filling Capacity | 180-200pcs | 240-300pcs | 300-360pcs | 400-480pcs | ||||||
Power | 1110-240V 50/60Hz | 1110-240V 50/60Hz | 1110-240V 50/60Hz | 1110-240V 50/60Hz | ||||||
Size:L*W*H (m) | 1.66Ã0.7Ã1.9 | 1.99Ã0.7Ã1.9 | 2.65Ã0.7Ã1.9 | 3.35Ã0.7Ã1.9 | ||||||
Package Size:L*W*H (m) | 1.75Ã0.85Ã2.1 | 2.1Ã0.85Ã2.1 | 2.8Ã0.85Ã2.1 | 3.5Ã0.85Ã2.1 | ||||||
Package | Composite Borad Box |
Main function and feature:
1.Filling and capping proces can be finished by the machine at one time.
2.With CO2 pressurization and vacuumization function.
3.Adopt isobar filling method and with unique pressure maintaining system, performance stable and reliable, beer loss minimum.
4.With pressure compressor, to gurantee a stable filling process.
Working process:
1. Connect beer, compressed air and Co2.
2. Turn the valve 1 to the position " down", and the cylinder goes down.
3. Turn the valve 2 to the position " pressurize" .
4. Observe the pressure value of the pressure gauge 4, set the pressure value a little lower than the fermenting tank pressure. For example, if the fermenting tank pressure is 0.15 MPA, please set the pressure gauge value as 0.11-0.12 MPA.
5. Turn the valve 4 to the position " Fill", then it start to fill, when the beer reach the required level , turn the valve 3 to the position " stop", and turn the valve 2 to the position " release", and when the pressure gauge shows "0", turn the valve 1 to the position " up", then the cylinder goes up.
6. Push the bottles to the capping station, Turn the valve 5 to the position "down", then it starts to seal, when finished, turn the valve 5 to the station " up" , the cylinder goes up.
We attend international and domestic exhibitions, face to face to introduce our customers the latest products and show our product quality
Service:1. Free consultation service. Technical support by or MSN/e clock2. Layout plan in 3D or CAD drawings of your brewery;3. Brewing technology,brewing formula,can be offered available
Lily for detailed information:
/span>ï¼ +8
Website: