Table Formwork is a fast and safe system for the buildings with early stripping mechanism.
Here are the advantages of this system:
- 1.Fast: one worker can achieve 100m2 one day
- 2.Long duration: the bamboo plywood could be used 30-50 times
- 3.Early stripping: after casting and the concrete strength reaches 13MPa, then remove the panels
- 4.Easy to handle: the worker can learn in a few minutes.
- 5.Reduce the cost: unlike the local plywood only 5-10 times duration, our formwork system can be used from 30-50 times.
- The formwork system contains 3 basic components:
- 1.The panel:
- Plywood type: Bamboo plywood (Recycle times: At least 30 times)
- Frame material: Steel Q235, Frame and plywood connected by rivets
- Surface treatment: Panel Frame Rails Powder Coated Orange
- Size: Max size 1.8m*1.2m, Min 0.6m*0.6m
- Weight: Max 43kg/1.8m*1.2m, Min 13kg/0.6m*0.6m
- If the bamboo plywood is broken, you can remove the rivets and then replace a new plywood.
- 2.The prop/shoring system:
- With early stripping head. Steel material, duration more than 5 years;
- Height 2.2m to 3.5m;
- Tube Thickness 3mm;
- With extensions, the prop can reach 5.5m;
- the load capcity of the prop is showed below:
- 3.The infill beam for the area around the column, wall, beam etc.
- Hang on the prop;
- Available working with traditional formworkï¼thickness 12mm;
- Duration more than 3 years.
- 4.Cantilever and its related items for boundary installation of formwork
- Projects references