According to the customersâ requirements and working condition , we would choose suitable
seal ring kit , . we would supply suitable seal solution for their customer so that hydraulic cylinder has more
lifetime , easy maintenance and simple repairing .
4.4 Tube and flange welding
The welding on cylinder tube and flange would be Ultrasonic tested every time , the welding seam would be
cleaned before machining .we ensure that every welding seam has no any leak during lifetime
4.5 Assembly and pressure test
Before hydraulic cylinder is assemblied , every spare parts would be measured and cleaned .After hydraulic
cylinder is assemblied , pressure test would be carried out one By one , eternal company ensure that testing
pressure is higher 30%-50% than working pressure , and pressure holding time 30~60 minutes is necessary . Every piece hydraulic cylinder must be tested completely without any leak .
4.6 Painting and storage .
After hydraulic cylinder pass through pressure test , painting is necessary .