HNAC Hydropower Plant/EPC Contracting/Turnkey Project
We aim to hand in hand with our worldwide client in converting the water potential into profitable and environmentally-friendly sources of energy. HNAC has rich experience in offering complete customized solutions to generate electricity.
EPC Service
In an EPC (Engineering, Procurement & Construction) Project, we can offer the following services:
Operaiton sites of Our Overseas Customers (partial)
1) Chile ROBLERIA Hydropower Project
Located in Linares, 350km away from Santiago, Chile
Design head: 128m; Design flow: 3.6 m3 /s
Installed capacity: 1*4MW (horizontal Francis turbine)
Annual output: 26.187MWh
The project was completed in Feb. 2013
2) Myanmar YAZAGYO Hydropower Plant
Located in north of Kalay District, Sagaing Division of Myanmar
Rated head: 33.6m
Installed capacity: 2*2MW (horizontal Axial-flow turbine)
The project is scheduled to complete in Mar, 2016
3) Pakistan Foundation Hydel Power Plant (FHPP) 3/4
The project is invested by Pakistan Atomic Energy Commission Foundation.
Design head: 13m; Design flow: 46m3 /s
Installed capacity: 2*2.5MW (vertical Axial-flow turbine)
The project is scheduled to complete in Oct, 2015
The project was completed in Nov. 2014 and July, 2015 respectively.
Installed capacity: 2*2.7MW (vertical Francis turbine) & 2*2.5MW (vertical Francis tur bine)
Design flow: 14m3 /s & 14.5m3 /s
Design head: 22m; &20.8m
Located in Ninh Son District, Ninh Thuan, southeast of Vietnam
4) Vietnam Ha Song 1 & Ha Song 2 Hydropower Project