High Quality Speed Control Governor For Hydraulic Turbine
Speed Control Governor For Brief Introduction
The YWT type product instruction microcomputer governor is a new governor for hydropower station, and its simple structure, high reliability, powerful function, fine adjustment performance, strong anti-disturbance performance etc. had solved that poor anti-disturbance performance, electric -hydraulic converter easy to be blocked, multifarious lever mechanism etc, In previously governor shown, so that this governor can auto-operate reliability and stably and to facilitate the turbine generator units control up to no-operation state.
Speed Control Governor For Hydraulic Turbine Application Scope
Itâs applicable for the single and double regulating systems of all types of the 1MW~100MW hydraulic turbines, including mixed-flow type, axial flow type, cross-flow type, and impulse type, etc.
Speed Control Governor For Hydraulic Turbine Main Features
Speed Control Governor For Hydraulic Turbine Technical Parameters
1. We can design and produce varieties of water turbine-generator sets and auxiliaries according to the special working conditions of certain power station specific needs, feel free to ask me for more information.
2. In order to our engineers make model selection and provide you with best solution, pls send us key technical parameters (such as Gross/Net Head, Water Flow, Installed Capactiy and Qty, Generator Voltage,Frequency etc. ) in inquiry.
3. If you are still puzzled about our product or need further disscuss with us, please send us e-mail or message, we will reply you first time we saw it.
HNAC Business Range: package solution design and E&M equipment turnkey basis for hydropower station, water conservancy, substation and water treatment etc.we combined the personnels and capability of Water conservancy and Hydropower Survey and Design Institute, supporting the customers from projet site investigation, feasibility study to engineering designs.
HNAC consolidated resources of professional E&M manufacturers in our supply chain,ranging from trash defender,hoist and gate of water in-take to penstock,main powerhouse equipments and auxiliaries,first and secondary electrical equipments, then to substation, transmission distribution station.
1.Power: 50kw~200Mw
2.Frequency: 50hz or 60hz
3.Output Type: AC three se
4.Output voltage: 400V, 3.3KV, 6.3KV, 10.5KV, or 13.8KV
5.Hydro power turbine's working Water head: for Francis turbine 20~500m for Pelton turbine 40-1700m for Kaplan turbine 2~70m for Tubular turbine 1~40m for Turgo turbine 40-250m6.Warranty period: 1 year(or more)