Custom made rubber stopper for furniture feet
SPECIFICATIONS
Customized plastic injection mold & mass production for plastic parts
Customer provide 3D drawing, we manufacturing
Surface finish : Matt/Glossy , Polishing, Chrome plating, Painting
High quality with competitive price
BUSINESS SCOPE
Plastic Injection molds Designing & Manufacturing
Plastic part Mold;Household Products Mold; Electronic Products Mold; Double Color Injection Mold
Plastic Products Mass Production
We have our own mould tooling machine and plastic injection of customer's make mold and do injection in our company
Provide one stop service
ABOUT DESIGN DRAWING
1. Client provide 3D drawing.
2. Actual sample. ( we will help customer make 3D drawing according their samples )
BASIC INFORMATION FOR INJECTION MOULDS
Code | Basic information | Answers |
1 | Mold design | According to customer product to design |
2 | Mold making | Plastic mold steel material,mold base,CNC machine,ne,EDM machine,grinder machine,assember,fit mold |
3 | Soft ware | CAD/CAM/CAE/UG/PROE/CAD/CAXA etc |
4 | process | CNC, High speed carve, E.D.M, l, Injection etc |
5 | Cavity | Single-cavity and Multi cavity |
6 | Use and manufacture | According to product precision to choice the different model 80T,120T,250T,450T,800T injection machine |
7 | Injection plastic type | Pinpoint,turnel,direct |
8 | Mold life | 50,000-3000,000 times |
9 | Mold steel | NAK55,NAK80, 2738, 2316, H13, 718,718H, S136,S136H, SKD61, P20,etc |
10 | Gate | Submarine gate, Side / Edge gate, Direct gate, Self-cutting gate etc. |
cheap plastic injection mould
1) Carton/wooden case package or according to customers requests
2) Shipping by sea/by air/by express, such as DHL,FedEx,TNT,UPS, etc.
PRODUCT SHOW
Plsc injton moldingcompany
FAQ
1. How can I get the price for my design ?
Send us 3D drawing and we will calculate the mould price for you within 24 hours .
2. What is the lead time for a new mold ?
It all depends on the mould’s size and complexity. Normally, the lead time is 25—35days.
If the moulds are very simple and not big size, we can work out within 15 days.
3. I don't have a 3D drawing ,how should I start the new project ?
You can supply us a sample, we will help you to finish the 3D drawing design.
4. How should I know if the product fit my standard ?
After the mould finished ,we will help you to test the mould for free and send sample for your confirmation ,if it is not good ,we will change it as your requirements.