Join today and be a part of the fastest growing B2B Network Join Now

3000L Water Tank Blow Molding Machine

  • Origin: China
  • Location: No.3 Qiangli Road,Jiaoxi Industrial Area, Jiaozhou
  • Supply Type: oem service
  • Processing Time: 3-4 Month
  • Min Order: 1

Supplier Info.

  • Location No.3 Qiangli Road,Jiaoxi Industrial Area, Jiaozhou
  • Employees Total 301-500
  • Annual Revenue US$5 Million - US$10 Million

The 3000L multi-layer water tank blow molding machine can be used to produce water tank from 500L to 3000L in 1-6 layers. In order to meet the market demand, we have independently developed horizontal water tanks. Induction heaters are used on the die heads of blow molding machines for the first time. Innovative die design, advanced electromagnetic induction heating system, safe and reliable, can reduce heating time and accurate temperature control, energy saving 30%-50%.

Latest Technology:

1.FOAM LAYER :

Foam layer as a new innovation which can increase the wall thickness.

2.INDUCTION HERTERS:

Induction heaters for die head and extruder can save 40-50% energy.

3.SERVO MOTOR:

Servo motor for clamping system which can save 40% energy.

4.REMOTE SERVICE:

Easier to check machine running conditions, cycle times, output,reminding for machine maintenance. Real-time monitoring is convenient for supplier to check the machine faulty and judge the machine problems.

customer service:

TRAINNINGThe Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;Â

INSTALLATION & ADJUSTMENTThe Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.The Buyer should make a reservation in advance before delivery of the machines;The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.

GUARANTEEÂ The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.

Premium Services
Tell us what you need
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok