Join today and be a part of the fastest growing B2B Network Join Now

Bogie_Furnace_Precautions

  • Origin: China

Supplier Info.

  • Employees Total 5-10
  • Annual Revenue US$2.5 Million - US$5 Million
Trolley furnace Precautions
1, the operator must be aware of the following points before servicing trolley furnace:
Structure and properties of A, furnace and its auxiliary equipment.
B, distribution systems, and control the position of the safety device is arranged such systems.
C, operating processes and safety procedures.
2, the preparatory work to check:
A, the power to check whether the device is normal, if there is loss of se, short circuit or bare n.
B, check the grounding ntact is good.
C, check whether there is damage to the heating ch connection at the is good, there is no place and the furnace and in with the casing.
D, check the temperature control system if there is not a normal nomenon.
E, check the door lift, car access is functioning.
3, corrosive, volatile, explosive gases allowed to enter the workpiece furnace processing, so as not to affect the heating actory life and cause explosions and other accidents.
4, must not over-temperature furnace operation, otherwise it will shorten the life of the equipment.
5, scale much need to clear the workpiece into the furnace, available under the iv>
6, the workpiece evenly stacked away from the heating around 100-150mm.
7, is strictly prohibited barbaric operation, the workpiece should be careful to avoid shock.
8, when the furnace using the operator must not leave the post, we must pay attention to the furnace working conditions are normal.
9, when the furnace during the loading and unloading of the workpiece, the power must be cut off the heating the safety of the operator.
10, furnace oxides (including under the electric lways be cleaned at least once or five times a week once the furnace. Compressed air is available under the oven floor.
11 If, after using the resistance not hit kinked avoid breakage.
12, note:
A, electric motors require periodic inspection, lubrication, etc., pay attention to safety.
B, at the shaft sleeve must always check lubrication to prevent damage due to lack of oil and bushings.
C, periodically check the use of the heating iv> D, periodic calibration instruments, the use of the thermocouple, the instrument to prevent the thermocouple temperature measurement error caused by incorrect.
Premium Services
Need Free Quotes
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok