Coating ures:
This is an economic type of coating y to most ACP top/bottom coil coating. Product thickness 0.1mm~0.5mm is common used for ACP. This coating also produce some gauges of roofing coils. With a rewinding s coating s basic requirements from raw material to finished product of coating factory. The ires a minimum 70mÃ12mÃ7m workshop dimension, which suits most factories in limited dimension.
Application: For coating top coil and bottom coil of ACP(Aluminium Composite Panel)Advantage: Economical and easy to use, small dimension workshop needed
1. Main parameters of coating an>
Material parameter
Thickness: | 0.1ï½0.5mm |
Width: | 1600mm |
Outer diameter OD(max): | Φ1400mm |
Inner diameter: | Φ150mm, Φ405mm |
Bobbin material: | Steel or paper |
Inverval-layers deviation tolerence: | â¤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers) |
Coil over-all deviation tolerence: | â¤2 mm (Excluding the bottom 5 layers and exterior 2 layers) |
Coating thicknes: | Dry film thickness: 8~20 um |
Product Weight: | Max 4000kgï¼Excluding bobbinï¼ |
CCL Processing Speed: 30 m/min (Speed benchmark: thickness 0.25mm coil exclude PVDF coating)
Heating Energy Source: LNG, LPG
Roller coating Process: Continuous 1 side 1 coating & baking
Properties and features:
Roller width: | 1800mm |
Coils feeding centering adjustment : | ±75mm |
Threading speed: | 5ï½15m/minï¼Adjustableï¼ |
mum speed: | 30m/min |
d accuracy: | Steady Speed, ±0.1%;Acceleration, ±0.4% |
Uncoiling tension range: | 160ï½700kgf |
Processing tension range: | 160ï½700kgf |
Coiling tension range: | 320ï½1200kgf |
Tension accuracy: | Steady Speed, ±1.0%; Acceleration, ±2.0% |
e dimensions: | 55000mmÃ7.500mmÃ6000mm |
Heating Energy Source: | LNG, LPG |
2. Basic Production Process
Coil loading â Uncoil machine â Pretreatment (Including Degreasing, Roller brushing device, drying) â Chromizing â Drying â Re-direction â Topside roller-coating â Curing oven â Cooling â Tension machine â Recoiler â Coil discharging
3. Main devices list
Name | Quantity |
Coil loading device | 1 |
Sewing table | 1 |
Pretreatment n> | 1 |
3M water drying device | 1 |
Chromizing Coater | 1 |
Chromizing drying device | 1 |
Coater | 1 |
Curing Oven | 1 |
Heating system | 4 |
Air cooling devices | 1 |
3-rollers cooling device | 1 |
Tension device | 1 |
Recoil machine | 1 |
Electrical system | 1 |
Rewinding n> | 1 |
Coil loading machine | 1 |
Tension device | 1 |
Coil discharging machine | 1 |
*Optional configuration: waste gas treatment and energy recycle system.
4. Water and power consumption of coating n>
Total power consumption: | 80KW |
Compressed air: | Min5.5barï¼1Nm3/min, actual consumption 0.5Nm3/min |
Water: | Deionized water, supply quantity is about 4T/h |
Heating fuel: | LPG or LNG |
LPG consumption: | 0.2 CBM/min |
LNG consumption: | 0.5 CBM/min |
5. The coating n> project design and manufacture leads 90 days, installation and testing leads 60 days. 6.Trade terms: FOB, CIF are available7.Payment terms: T/T, D/P, LC are acceptable8. Packing style: Wooden pallet9. Transportation: by sea