Join today and be a part of the fastest growing B2B Network Join Now

TZ1300-25 1-side 1-coating Line

  • Origin: China
  • Supply Type: oem service
  • Processing Time: 65-120days

Supplier Info.

  • Employees Total 11-50
  • Annual Revenue

TZ1300-25 1-side 1-coating t>

Coating n> functions:

This is an economic sort of coating te to slim ACP top/bottom coil coating. Product thickness 0.02 mm ~ 0.1 mm appropriates for dividing panels This coating n enhance for those coating factories which intend to enhance product variety. It also matches factories in restricted measurement.Application: For coating top coil and bottom coil of ACP( Aluminium Composite Panel), specially for coating slim gauge aluminium coil making use of for dividing panels.

Advantage: Economical and also easy to use, tiny dimension workshop needed

1. Main parameters of coatingn>

Material parameter

Thickness:

0.02~0.1mm

Width:

1240mm

Outer diameter OD(max):

Φ1100mm

Inner diameter:

Φ150mm, Φ405mm

Bobbin material:

Steel or paper

Inverval-layers deviation tolerance:

≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coil over-all deviation tolerance:

≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coating thickness:

Dry film thickness: 8~15 um

Product Weight:

Max 3000kg(Excluding bobbin)

CCL Processing Speed: 25 m/min (Speed benchmark: thickness 0.1mm coil exclude PVDF coating)

Heating Energy Source: LNG, LPG

Roller coating Process: Continuous 1 side 1 coating & baking

Properties and features:

Roller width:

1500mm

Coils feeding centering adjustment :

±75mm

Threading speed:

5~10m/min(Adjustable)

mum speed:

25m/min

d accuracy:

Steady Speed, ±0.1%;Acceleration, ±0.4%

Uncoiling tension range:

80~150kgf

Processing tension range:

80~150kgf

Coiling tension range:

80~200kgf

Tension accuracy:

Steady Speed, ±1.0%; Acceleration, ±2.0%

e dimensions:

55000mm×7500mm×6000mm

Heating Energy Source:

LNG, LPG

2. Basic Production Process

Coil loading → Uncoil machine → Pretreatment (Including Degreasing, Water washing) → Chromizing → Drying → Re-direction → Topside roller-coating → Curing oven → Cooling → Tension machine → Recoiler → Coil discharging

3. Main devices list

Name

Quantity

Coil loading device

1

Sewing table

1

Pretreatment n>

1

Drying device

1

Coater

1

Curing Oven

1

Heating system

3

Air cooling devices

1

3-rollers cooling device

1

Tension device

1

Recoil machine

1

Electrical system

1

*Optional configuration: waste gas treatment and energy recycle system.

4. Water and power consumption of coating n>

Total power consumption:

50KW

Compressed air:

Min5.5bar,1Nm3/min,actual consumption 0.5Nm3/min

Water:

Deionized water, supply quantity is about 4T/h

Heating fuel:

LPG or LNG

LPG consumption:

0.2 CBM/min

LNG consumption:

0.5 CBM/min

5. The coating gn and manufacture leads 90 days, installation and testing leads 60 days.6.Trade terms: FOB, CIF are available7.Payment terms: T/T, D/P, LC are acceptable8. Packing style: Wooden pallet9. Transportation: by sea

More information please click here.

Premium Services
Tell us what you need
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok