The main production process
OEM casting | According to the customer's requirements |
raw material | GG25/GG20/QT400 |
Technological route | Model making→Pouring→Opening→Machining→dynamic balance→paint→ Finishing→Heat treatment→Non-destructive→Inspection→packing |
Standard | ISO9001-2000 |
Casting process | silica sol investment casting,Sodium Silicate sand casting,Sodium Silicate investment casting, lost-wax investment casting, clay sand casting, furan resin sand casting, shell Casting, die casting |
Inspection | magnetic particle test, tensile test, etc. |
Surface treatment | Anti-rust oil, zinc-plating, paint or as per requirements |
technical parameter
| a | b | c | d | e | f | h | 34# | 38# |
SPZ | 9.7 | 8.5 | 8 | 12 | 8 | 2.5 | 12 | P <=80 | P >= 80 |
SPA | 12.7 | 11 | 10 | 15 | 10 | 3.5 | 15 | P <=118 | P >= 118 |
SPB | 16.3 | 14 | 12.5 | 19 | 12.5 | 4 | 18 | P <=190 | P >=190 |
SPC | 22 | 19 | 16 | 25 | 16 | 5 | 24 | P <= 315 | P >=315 |
If you need other specifications,we also can manufacture according to customer drawings or samples.
(customized is accepted)
Advantages:
1.We have manufactured castors,forklift wheels and other similar products for 32 years, professional manufacturers .
2.With strong supply ability.
3.With reasonable price,punctual delivery and good service.
4. High quality material make high quality products.
Q:Are you trading company or manufacturer ?A: We are manufacture.Our factory has been specializing in all kind of casters,electric forklift wheel,hand pallet truck wheel and so on since 1985.Q: Do you provide samples? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay the cost of freight.Q:What is your package ways?A:Generally,carton+wooden pallet.We can also pack according to customer's requirement.Q:What is your delivery time?A: Generally,within 25 days. It also depends on the order quantity.