Dears We would to set up EPC plant for 12 KTY, P4 yellow phosphorus plant, included: Engineering, equipment and construction supervision & design, installation plus commissioning 50% from production will be converted to phosphoric acid food grade 85% Your quotation should include: Show More...
Dears We would to set up EPC plant for 12 KTY, P4 yellow srus plant, included: Engineering, equipment and construction supervision & design, installation plus commissioning 50% from production will be converted to sric acid food grade 85% Your quotation should include: 1-Equipment list such as: Submerged arc furnace, electric transformers, gas towers cleaning, up cranes 30 and 5 tons, pumps 60 m3 hour, Slag crucible, control board, dryers, hydrator, Trucks, loaders and Clark cranes . 2-Required land area . 3-Estimated civil works design and "concrete m3" and roads length . 4-Required labor " staff" and types . 5-Laboratory equipment . 6-steam section 7-Packing system . 8-Rock Handling System . 9-Reaction Section . Filtration Section10- 11- 24month recommended spare parts estimated cost . 12-installation cost Environment protection system13- Our proposed. Raw material consumption index for 1t yellow srus: Rock ste Base 24%, 11 ton- Coke Base on C84%, 1.65 ton Silica Base on SiO299%. 95 ton Electrode 30 kg Thanks and regards AEGCC" Arab Egyptian Gas & Chemicals Co" Mohamed EL Sharkawy 3, Gol Gamal street, flat #8, Mohandessin, Gizah, Egypt