We are the manufacturer of steel panel radiator, towel radiator, solid fuel boiler, water boiler and wall hung gas boiler since 1993 in Turkey.
As Emko we export to 63 countries and our panel radiators widely known in Europe, U.S.A, Iran, Ukraine, Russia and China as well.
We have 3 production lines in our facilities and our production capacity is arround 800.000 Pieces Towel Radiator, 1.000.000 pieces Steel Panel Radiator and 150.000 pieces wall hung gas boilers.
In Turkey there are few companies which are exporting Well Hung Gas Boiler, Towel Radiators and Steel Panel Radiators to U.S.A., China, Russia and Europe. We are one of them.
Let me talk about our certificates. We have ISO, CE, ROHS, EN 442 certification. Also we give 5 Years of Warranty for our Towel Radiators and 10 Years Warranty for Steel Panel Radiators.
We use CCR6112 A1 quality colled rolled steel which we buy from ERDEMIR " http://en.erdemir.com.tr/ ".
The delivery time is 1 week for steel panel radiator and towel radiator, 3 weeks for solid fuel boiler, boiler and wall hung gas boiler.
We are the manufacturer of steel panel radiator, towel radiator, solid fuel boiler, water boiler and wall hung gas boiler since 1993 in Turkey.
As Emko we export to 63 countries and our panel radiators widely known in Europe, U.S.A, Iran, Ukraine, Russia and China as well.
We have 3 production lines in our facilities and our production capacity is arround 800.000 Pieces Towel Radiator, 1.000.000 pieces Steel Panel Radiator and 150.000 pieces wall hung gas boilers.
In Turkey there are few companies which are exporting Well Hung Gas Boiler, Towel Radiators and Steel Panel Radiators to U.S.A., China, Russia and Europe. We are one of them.
Let me talk about our certificates. We have ISO, CE, ROHS, EN 442 certification. Also we give 5 Years of Warranty for our Towel Radiators and 10 Years Warranty for Steel Panel Radiators.
We use CCR6112 A1 quality colled rolled steel which we buy from ERDEMIR " http://en.erdemir.com.tr/ ".
The delivery time is 1 week for steel panel radiator and towel radiator, 3 weeks for solid fuel boiler, boiler and wall hung gas boiler.