Quick Details
- Processing Time:-
- Port:-
- Supply Ability: -
- Brand Name:-
HNAC Hydropower Plant/EPC Contracting/Turnkey Project
We aim to hand in hand with our worldwide client in converting the water potential into profitable and environmentally-friendly sources of energy. HNAC has rich experience in offering
complete customized solutions to generate electricity.
EPC Service
In an EPC (Engineering, Procurement & Construction) Project, we can offer the following services:
Site survey and feasibility study;
Design
Manufacture and procurement
Installation & Supervision
Commissioning & Training
Operation and maintenance
Remote monitoring
Upgrading and renovation
Operaiton sites of Our Overseas Customers (partial)
1) Chile ROBLERIA Hydropower Project
Located in Linares, 350km away from Santiago, Chile
Design head: 128m; Design flow: 3.6 m3 /s
Installed capacity: 1*4MW (horizontal Francis turbine)
Annual output: 26.187MWh
The project was completed in Feb. 2013
2) Myanmar YAZAGYO Hydropower Plant
Located in north of Kalay District, Sagaing Division of Myanmar
Rated head: 33.6m
Installed capacity: 2*2MW (horizontal Axial-flow turbine)
The project is scheduled to complete in Mar, 2016
3) Pakistan Foundation Hydel Power Plant (FHPP) 3/4
The project is invested by Pakistan Atomic Energy Commission Foundation.
Design head: 13m; Design flow: 46m3 /s
Installed capacity: 2*2.5MW (vertical Axial-flow turbine)
The project is scheduled to complete in Oct, 2015
The project was completed in Nov. 2014 and July, 2015 respectively.
Installed capacity: 2*2.7MW (vertical Francis turbine) & 2*2.5MW (vertical Francis tur bine)
Design flow: 14m3 /s & 14.5m3 /s
Design head: 22m; &20.8m
Located in Ninh Son District, Ninh Thuan, southeast of Vietnam
4) Vietnam Ha Song Pha 1 & Ha Song Pha 2 Hydropower Project