High Quality Speed Control Governor For Hydraulic Turbine

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:L/C

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Packaging & Delivery Packaging Details 1, Wood Box Packing for hydraulic speed governor 2, Custimazition available depends on customers' requirements Delivery Time Shipped in 30 days after payment or discussed High Quality Speed Control Governor For Hydraulic Turbine   Product Description   Speed Control Governor For Brief Introduction The YWT type product instruction microcomputer governor is a new governor for hydropower station, and its simple structure, high reliability, powerful function, fine adjustment performance, strong anti-disturbance performance etc. had solved that poor anti-disturbance performance, electric -hydraulic converter easy to be blocked, multifarious lever mechanism etc, In previously governor shown, so that this governor can auto-operate reliability and stably and to facilitate the turbine generator units control up to  no-operation state. Speed Control Governor For Hydraulic Turbine Application Scope It’s applicable for the single and double regulating systems of all types of the 1MW~100MW hydraulic turbines, including mixed-flow type, axial flow type, cross-flow type, and impulse type, etc. Speed Control Governor For Hydraulic Turbine Main Features For all types of hydraulic turbine units (mixed-flow, axial-flow, cross-flow and impulse type) Adopt standard control valve of hydraulic system. Rated Oil pressure: 2.5MPa  4.0MPa  6.3MPa  16MPa PWM digital valve regulating technology PID Regulating  Speed Control Governor For Hydraulic Turbine Technical Parameters Regulation law  parallel PID peed dead-band of hydraulic turbine control system large≤0.02%; medium-sized≤0.06%; small-scale≤0.1% permanent difference coefficient     bp         0~10% temporary droop coefficient             bt         1~200% Buffer time constant                        Td         1~20S Acceleration time constant              Tn         0~5s Frequency setting range                 45~55HZ Power setting range                        0~120% Adjustable range of opening            0~105% Frequency artificial failure band       0~±0.5HZ Adjustable Power Supply                                   AC / DC standby     Our Services 1. We can design and produce varieties of water turbine-generator sets and auxiliaries according to the special working conditions of certain power station specific needs, feel free to ask me for more information.   2. In order to our engineers make model selection and provide you with best solution, pls send us key technical parameters (such as Gross/Net Head, Water Flow, Installed Capactiy and Qty, Generator Voltage,Frequency etc. ) in inquiry.   3.  If you are still puzzled about our product or need further disscuss with us, please send us e-mail or message, we will reply you first time we saw it. HNAC Business Range: package solution design and E&M equipment turnkey basis for hydropower station, water conservancy, substation and water treatment etc.we combined the personnels and capability of Water conservancy and Hydropower Survey and Design Institute, supporting the customers from projet site investigation, feasibility study to engineering designs.   HNAC consolidated resources of professional E&M manufacturers in our supply chain,ranging from trash defender,hoist and gate of water in-take to penstock,main powerhouse equipments and auxiliaries,first and secondary electrical equipments, then to substation, transmission line,even distribution station. 1.Power: 50kw~200Mw 2.Frequency: 50hz or 60hz 3.Output Type: AC three phase 4.Output voltage: 400V, 3.3KV, 6.3KV, 10.5KV, or 13.8KV 5.Hydro power turbine's working Water head:                                       for Francis turbine 20~500m                                      for Pelton turbine 40-1700m                                      for Kaplan turbine 2~70m                                      for Tubular turbine 1~40m                                      for Turgo turbine 40-250m 6.Warranty period: 1 year(or more)

Worldwide Importers