Quick Details
- Processing Time:-
- Port:-
- Supply Ability: -
- Brand Name:-
Rigid Board FR4 Single Side PCB With HASL-Lead Free Surface Finish In White
Legend
1.Company introduction
Abis Circuits Co.,Ltd is a professional PCB manufacturing in
Shenzhen, China which is focus on double side, Multilayer and HDI PCB mass production. Our company was established in 2006. We have two factories together and offer a wide range of services from
quick turn, PCB prototypes to large volume PCB manufacturing. Our aim is help the clients gain more competitive strength and bring more mutual benefit to each other. All clients will be served
well.
2.Factory
Operation plant space:
(I) 10000 Square meters
(II) 60000 Square meters
Employees:
(I) 300 Man Powers
(II) 900 Man Powers
Eng. Technical:
(I) 20 QA QC Engineers
(II) 60 QA,QC Engineers
3.Technological capability
No
Items
Capability
1
Layers
1-20
2
Base Material
FR4, High Tg FR4, Halogen Free, Isola, Rogers, Aluminium, etc
3
Max. Size
600mm x 1200mm
4
Finished Board Thickness
0.2mm-8.0mm
5
Copper Thickness
0.5oz-10oz
6
Surface Finishing
HASL, Lead Free HASL, Immersion tin, Immersion gold, Gold plating, Immersion silver, OSP,
etc.
7
Min. Trace Width/Space
0.075/0.075mm
8
Min. Finish Holes Size
0.1mm for mechanical holes
9
Diameter Tolerance
0.05mm for mechanical
10
Registration
0.075mm for mechanical
11
Soldermask Color
Green, White, Black, Red, Yellow, Blue
12
Silkscreen Color
White, Black, Yellow, Blue
13
Impedance Control
+/-10%
14
Profiling Punching
Routing, V-CUT, Chamfer
15
Special Holes
Blind/Buried holes, Countersunk holes
16
Reference Standard
IPC-A-600H Class 2, Class 3, TS16949
17
Certificate
ISO14001, ISO9001, UL, cUL
18
PCB Package
Vacuum & Carton
4.Lead time
Category
Quickest Lead time
Normal Lead Time
Mass Production
2 Layers
24hrs
3-4 working days
8-15 working days
4 Layers
48hrs
3-5 working days
10-15 working days
6 Layers
72hrs
3-6 working days
10-15 working days
8 Layers
96hrs
3-7 working days
14-18 working days
10 Layers
120hrs
3-8 working days
14-18 working days
12 Layers
120hrs
3-9 working days
20-26 working days
14 Layers
144hrs
3-10 working days
20-26 working days
16-20 Layers
Depends on the specific requirements
Above 20 Layers
Depends on the specific requirements