Prefabricated Light Steel Structure Storage Warehouse Buildings Steel Structure Workshop Building

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:-

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Product specifications Steel structure building is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc. Product name Prefabricated light steel structure storage warehouse buildings Column and beam H beam steel Purlin C/Z section steel Wall & roof material 50/75/100/150mm EPS/PU/rockwool/fiberglass sandwich panel Connect Bolt connect Window PVC or aluminum alloy Door Electrica shutter door/sandwich panel door Certification ISO9001/CE Material show Sandwich panels are mainly used in buildings that require heat preservation and heat insulation. The sandwich panel’s core materials mainly include polyphenylene, polyurethane foam, rock wool, and glass wool. The roof and wall panels are to ensure a normal and safe production environment in the workshop. It forms a wind load that bears and transmits the wall’s weight through the foundation, wall girt, and wind-resistant columns, and the wind load acts on the wall. The frame structure system is composed of horizontal and vertical plane frames. As the basic load-bearing structure of the steel structure workshop, the horizontal plane frame is significant. It is composed of a foundation, roof beams, and steel columns. Installation 1.To provide product installation drawings and video, if you have special requirements, we also have engineers to guide the installation. It is very easy to assemble and disassemble, you can install the house just like playing the Block Game. One worker can assemble 40-50 square meters in 8 hours, also you can build the house just follow our video. 2. if have any problems, we will promptly give a reasonable solution 24 hours. Packing and loading 1.The primary and secondary steel are packaged as a whole; 2.The accompanying items are packed in boxes; 3.The roof, wall panels and accessories are packed in bulk; 4.Each part of all items is printed with an independent number, which is convenient for customers to install and use; 5.Adopt the most reasonable packing scheme to ensure the maximum use of the container's space load;