Quick Details
- Processing Time:-
- Port:-
- Supply Ability: -
- Brand Name:-
Compact shovel 2.5 Ton Wheel Loader 65kw 88hp Power
1. Products Description
we need the construction machine to do heavy work, obviously it has to be efficient, take loader as an example, the bucket should shovel as much as possible, the loader should be stable while
working, the control should be flexible and easy, the malfunction rate is low of course.
MCLLROY wheel Loader is a kind of front wheel loader with single bucket ,articulated and hydraulic unloading. It has been developed and designed in accordance with user requirements, reference
models after absorption of domestic and overseas advanced similar structural features and advanced technology.
2. Specification
Model
MCL936
ZL936
Rated Load
kg
2000
Dipper Bucket Capacity
m³/m
1.1/2.0m
Max.Dump Clearance
mm
3500
Dump Reach
mm
1650
Overall Size (L*W*H)
mm
6025*2000*3000
Engine Model
YN4100 Supercharged
Rated power
kw
65
speed/min
rpm
2400
Gear Box
280B Split Torque converter
Alex
M-hub reductro
Operating Weight
kg
5300
Articulated
Articulated
Tyre Size
1670-20
Joystick included
Mechanical
Aircon
included
Hydraulic pilot(option)
Without
running hour meter
running hour meter
air brake
air brake
3. Details and Advantages
The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.
1) Engine:Domestic famous engines ,green/turbocharged/inter-cooled engine.
2) Transmission:Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China.
3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.
4) Hydraulic system:Precision hydraulic cylinder and the fourth generation hydraulic transmission system give large breakout force for earth-moving work.
4.Production lines:
A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection
Assembly:
Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.
First, our workers will assemble the front frame, rear frame, swing frame, front axle, rear axle together, and then install air tank, relief valve, air booster pump on the frame.
At this step, the worker should pay attention to the tightness of the screws and adjust the gap: for example, the hinged part is not supposed to move up and down and must be tight (can be shaken
left and right); there is also a gap between the swing frame and rear frame, which can be moved up and down, but not back and forth; and Gear oil should be added to the front and rear axles.