2.5 Ton Front Wheel Loader Machine Compact With 65kw 88hp Power

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:-

Chanchiyo Holdings Group

China

Port: -

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Compact shovel 2.5 Ton Wheel Loader 65kw 88hp Power 1. Products Description we need the construction machine to do heavy work, obviously it has to be efficient, take loader as an example, the bucket should shovel as much as possible, the loader should be stable while working, the control should be flexible and easy, the malfunction rate is low of course. MCLLROY wheel Loader is a kind of front wheel loader with single bucket ,articulated and hydraulic unloading. It has been developed and designed in accordance with user requirements, reference models after absorption of domestic and overseas advanced similar structural features and advanced technology. 2. Specification Model   MCL936 ZL936 Rated Load kg 2000 Dipper Bucket Capacity m³/m 1.1/2.0m Max.Dump Clearance mm 3500 Dump Reach mm 1650 Overall Size (L*W*H) mm 6025*2000*3000 Engine Model   YN4100 Supercharged Rated power kw 65 speed/min rpm 2400 Gear Box   280B Split Torque converter Alex   M-hub reductro Operating Weight kg 5300 Articulated   Articulated Tyre Size   1670-20 Joystick included   Mechanical Aircon   included Hydraulic pilot(option)   Without running hour meter   running hour meter air brake   air brake 3. Details and Advantages The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts. 1) Engine:Domestic famous engines ,green/turbocharged/inter-cooled engine. 2) Transmission:Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China. 3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide. 4) Hydraulic system:Precision hydraulic cylinder and the fourth generation hydraulic transmission system give large breakout force for earth-moving work. 4.Production lines: A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection Assembly: Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components. First, our workers will assemble the front frame, rear frame, swing frame, front axle, rear axle together, and then install air tank, relief valve, air booster pump on the frame. At this step, the worker should pay attention to the tightness of the screws and adjust the gap: for example, the hinged part is not supposed to move up and down and must be tight (can be shaken left and right); there is also a gap between the swing frame and rear frame, which can be moved up and down, but not back and forth; and Gear oil should be added to the front and rear axles.