Quick Details
- Processing Time:15-30 days
- Port:Qingdao China
- Supply Ability: 10000000 Tons Per Year
- Brand Name:ZIBO QIMINGXING NEW MATERIAL
Item
Index
Color
Grey(White Grain)
Density(g/cm3)
2.0
Weight Ratio(A:B)
2:1
Operating time(min)
10~30(can be customized)
Minimum curing time(min)
30
Full curing time(h)
4
Hardness after solidify(Shore D)
100.0
Compressive strength(Mpa)
111.0
Shear strength(Mpa)
32
Working temperature(℃)
-20~80(Customized for high temperature)
Qimingxing's wearing compounds are unique patented epoxy resin systems containing
diamond hard ceramic beads that resist sliding abrasion. Directions for use-surface preparation: Proper surface preparation is critical to the long termm performance of this product.The exact
requirements vary with the severity of the application, expected service life, and initial substrate conditions. 1.On all vertical r overhaed applications,tacking welding expanded metal mesh onto
the metal substrate is strongly reconnended prior to application of Wearing Compound. 2.Clean,dry,and abrade application surface.The more torough the degree of surface preparation, the better the
performance of the application.If possbible,it is recommended that the surface be grit blasted to a Near White Metal(SSPC-SP10/NACE No.2)Standard.For less severe applications,roughening the
sureface with hand tools is suirtable. Mixing:
1.Measure 2 parts resin to 1 part hardener by volume or weight
on a clean and dry mixing surface and mix together until iniform in color.(If resin and hardener temperatures are 15℃/60℉ or below,prehead resin only to about 21℃/90℉ but not to exceed 37℃/100℉)
2.Immediately after abrasive blasting,rub a thin layer of material onto the surface to "wet" for good adhesion.) Operation:
1.Apply filly mixed material to the prepared surface.
2.Initially apply the material in a very thin layer to "wet" out the surface and avoid air entrapment. 3.At 25℃/77℉,the working time is 30 minutes.Working and solidify time depend on
temperature and mass;the higher the temperature,the larger the mass , the faster the solidifying. 4.Functional cure time is 7 houra at 25℃/77℉. 5.Caution!Use
approved,positive-pressure,supplied-air respirator when welding or torch cutting near cured compound. Use approved self-contained breathing apparatus when burning,welding,or torch cutting
indoors near cured compund.Use approved respirator for dests and mists when grinding or machining cured compound. Do not use open flame on compound.See other cautions on Material
Safety Data Sheet.
Package:
1. Plastic drum packaging.
2. The outside of the plastic bucket is packed with
Polyron.
3. Pack again in a carton.