Quick Details
- Processing Time:-
- Port:-
- Supply Ability: -
- Brand Name:-
Product Description
Product Name
Industrial Design Plastic Mold Making Factory for Plastic Production
Mould material
P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc
Information to quote
samples or 2D.3D drawings.
Leadtime for mould
15--45days, on basis of the difficulty level
Service life
50 thousand shots
Cavity number of mold
2 cavities
Runner system
Hot runner , Cold runner
Surface treatment
Words corrosion, Mirror polish ,Frosted surface or textured surface
Main process
Milling, grinding, CNC, EDM, wire-electrode cutting, carved, electrospark, lathe, etc
Application
Automobiles, home appliances, medicine, daily necessities, sanitary wares, photographic equipment accessories, and construction fields, etc.
quotation time
Within 2 hours after receipt of drawings.
Mould testing
All of the moulds would be well tested before the shipments. Videos for testing the moulds are available according to clients’ requirements.
packages
In strong wooden pallets to avoid any damages during the transportation