Quick Details
- Red:Black
- Processing Time:15 to 20 days
- Port:Oakland
- Supply Ability: 100 Units Per Week
- Dimension(L*W*H):5700*1820*2400mm 6400*2270*2340mm 7100*2260*2450mm 7100*2250*2450mm 7662*2162*2450mm
- Condition:Brand New2
- CNC or Not:CNC
- Brand Name:YG-320A HDD Horizontal
- Certification:CE
- Place of Origin:China
- Brand Name:YG-320A HDD Horizontal
OVERVIEW
YG-320A HDD Horizontal Directional Drilling Machine 320kN Gas Pipe Drilling Rig Crawler Soil Drilling Horizontally
Product
Description
Horizontal directional drilling rig
Drilling rig system-it is composed of a main drilling rig, a turntable,
etc. The main drilling rig is placed on the drilling frame to complete drilling operations and towing operations. The turntable is installed at the front end of the main body of the
drilling rig, connected to the drill rod, and by changing the rotation of the turntable and the output speed and torque to meet the requirements of different operating conditions.
Model
YG-160A
YG-180
YG-280
YG-320
YG-320A
Engine rated power
100KW
97KW
160KW
140KW/160KW
160KW
Push and pull
Cylinder
Motor
Motor
Cylinder
Motor
Maximum drag/feed force
160/100KN
180/180KN
280/280KN
320/320KN
320/320KN
Maximum torque of power head
5000N.n
6000N.n
10000N.n
12000N.n
12000N.n
Power head speed
0-180r/min
0-140r/min
0-120r/min
0-140r/min
0-140r/min
Moving speed of power head
30m/min
20m/min
20m/min
20m/min
20m/min
Maximum reaming hole diameter
Φ600mm
Φ600mm
Φ750mm
Φ800mm
Φ800mm
Drill rod length (single)
3m
3m
3m
3m
3m
Drill pipe diameter
Φ60mm
Φ60mm
Φ73mm
Φ73mm
Φ73mm
Drill pipe diameter
10-23°
10-22°
10-23°
10-20°
10-20°
Maximum mud flow
160L/min
250L/min
320L/min
320L/min
320L/min
Maximum mud pressure
100bar
80bar
80bar
80bar
80bar
Overall quality
6700kg
8500kg
12500kg
11500kg
11200kg
Dimensions (length*width*height)
5700*1820*2400
mm
6400*2270*2340
mm
7100*2260*2450
mm
7100*2250*2450
mm
7662*2162*2450
mm
Feature:
1.Do not obstruct traffic, do not damage the road.
2.High precision, can be turned, the depth can be adjusted at any time, and obstacles can be avoided.
3.City construction will pass three meters, and the river will reach 6-18 meters.
4.The project period is short, the construction personnel are less, it is safer and the cost is lower.
Packaging &
Shipping
1.
Packaging:
Packed by standard import & export wooden cases or carton
boxes.
2.
Shipping:
By logistics; by automobile; by train; by shipping; by air
etc.