Green Formwork-TB Beam-Beam Drophead System Slab Formwork Early Stripping Slab Formwork Shoring System Concrete Formwork Panel Formwork Scaffolding Steel Prop

FOB Price: USD 25 - 200
|
300 Square Meters (Min. Order)
  • Supplying Ability100000 Square Meters Per Month
  • Supplying TypeIn stock
  • Model NumberTB-BBES
  • Preferred Payment Method:T/T, L/C

Quick Details

  • Main Beam:Alumiunm
  • Secondary Beam:Aluminmun/Steel beam
  • Finishing:Powder coating
  • Processing Time:35days
  • Port:China Main Ports
  • Supply Ability: 100000 Square Meters Per Month
  • Brand Name:TB
  • Model Number:TB-BBES
  • Place of Origin:China
  • Brand Name:TB
TB Beam-Beam drophead system formwork is compose of aluminum beam, steel secondary beam, drophead and cantilever frame. The specification of main beam and secondary beam can meet the requirements of the space among the uoright tubes of all shoring system in the market at presents, it works with all kinds of scaffolding such as ADG Scaffolding (French), Disc Scaffolding (Germany), Cuplock scaffolding, wheel scaffolding , Keyway Scaffolding, Cuplock Scaffolding, etc. Early drophead is used in 48 and 60 upright tubes. Main beam, Secondary Beam and plywood are stripped by early drophead system.    Al Alloy Main Beam: Secondary Beam Option1 (Steel profile)      Secondary Beam Option2 ("Π"type steel beam with wood)  Site Photos: