Quick Details
- Processing Time:3month
- Port:ningbo
- Supply Ability: 5-6projects at same time Sets Per Month
- Brand Name:-
JMT MOULD
AUTO LIGHTING MOULD FACTORY
Are you a looking for good Lamp mold maker in china?, molder or OEM working ? Have you met with your industry colleagues
recently? Taizhou huangyan JMT mold co.,ltd is one of the famous mould factory in Zhejiang China. JMT Mould isspecialized in Lamp mould design and process From 2002 until today.
We making car lamp mould for customers all over the world both in
OEM and aftermarket .We sevice for SUZUKI,TOYOTA,REYNOLDS,HONDA and so on .
There are three important steps in a head lamp & tail lamp mould project, first of all is the mould design. As you know. JMT company get more than 20 designers and they are
all with rich experience with mould design. Mould design is called the key of a good quality mould as so many straucture in a mold ,like insert/slider/undercut/ and so on, if without good
design you have trouble in the future, Especially the car light mould, it’s huge and hard jobs .You need design the cooling system as well as the eject / hot runner system.
Second is the mould process. It’s so important so that require high precision processing machins. JMT company invest lots of money with those process machines. In the lamp mould Process
,there are many jobs need to do, like: engaving / CNC milling / electric spark / drilling /tempering / texture/argon arc welding and so on. Such a long line of process so decide one
hundred working days for finish the lamp mould then we move to the mould trial.
Thirdly is the fitting. It’s the last job of the mould project. when we got the mould trial sample we have to assemble it on the car to check if is everywhere in good fiting, if here no
problem we can ship the mould. if still some we will check injection lamp mold design and process and find the
problem and solve it.
BASIC INFOMATION
Name
Fog lamp cover mould
Plastic resin
ABS
Mould dimension(mm)
700x630x680
Mould weight (T)
1.48T
Mould cavity steel
1.2738
Mould Core steel
1.2738
Manufacture time (day)
55~65 DAYS
Mould life (ten thousand)
≥30
Cycle time
45~50 S
Cooling line connector type
DME NS350 SERIES quick coupling, connected to main water manifold by FST100 MS joint connector, excellent cooling system design