Quick Details
- Color:Green
- Size:1000x500x400mm
- Void Rate:95%
- Loading Capacity:30-65 Tons/m2
- Storage Capacity:200 L/Tank
- Service Life:50 years
- Installation:Underground
- Type:Modular Rainwater Tank
- Processing Time:7 days
- Port:Shenzhen
- Supply Ability: 50,000 Cubic Meters Per Month
- Place of Origin:China
- Brand Name:Doctor Rain
- Model Number:YBS-M1000
- Brand Name:Kingly Group
PRODUCT DETAILS:
Model No.: YBS-M1000
Size: 1000x500x400mm
Weight: 16kg/tank
Void Ratio: 95%
Storage Capacity: 190L/tank
Load Capacity: 300KN/m2 -600KN/m2
Temperature: -30℃-120℃
Material: 100% recyclable PP
Service Life: 50 years
PRODUCT ADVANTAGES:
1.Flexible Modular Design: The size and shape of the underground pool which made up of the modular rainwater tank can be assembled according to the need of the site.
2.High Loading Capacity: the vertical loading capacity of some of some models of rainwater modular tanks can reach 65 tons, the lateral loading capacity can reach 15 tons.
3.High Void Ratio: the void space inside the rainwater tank reaches 95%,we can storage more water in it.
4.Long Service Life: The designd service life of the modular tank is 50 years.
5.Easy Installation: the assembling of the modular tank can be done just by hands, no large machines required.
6.Time Saving: one person can install 75 cubic meters each day.
7.Compact Storage: the modular tank is stackable,can be piled on pallets, one 40'HC container can hold 294.4 cubic meters.
8.Environmental protection: the modular rainwater tank can be made of 100% recyclable pp material.
9.Money Saving: Compared with the traditional stainless steel and concrete pools, our modular rainwater Tank reduces the time cost, transportation cost and later maintenance cost in many
ways.
PRODUCT APPLICATIONS:
Rainwater Modular Tanks can be used in a wide range of areas, including urban residential areas, municipal public roads, squares, Park greening, industrial parks and so on, saving limited
external space. The rainwater collection module can be installed in the driving area and cover a greater depth in the driving area. Reasonable installation of the module in the driving area must
be carried out at the request of professional engineers.