Quick Details
- Processing Time:-
- Port:-
- Supply Ability: -
- Brand Name:-
Custom Aluminum Bronze Bushing Spare Parts
Product Description
Brand Name
BRM
Forming Method
Powder Metallurgy-Metal Powder Compaction/Compression
Material
ss306
Application
Lamp parts
Surface Treatment
Surface Carburizing, Nitriding, Carburizing and High Frequency Quenching
Black Oxide Finish, Immersion Oil, Electroplating
Post Treatment
Sizing, Machining, Heat Treatment, Plating
Tolerance
±0.05mm
OEM
Available
MOQ
It depends on your parts’ size or shape
Quality Control
100% inspection on critical dimensions before shipment.
Drawing Format
2D: JPG/ PDF/ DWG
3D: IGS/ STEP
Payment Terms
T/T, Paypal, West Union, etc.
Delivery Time
15-21 working days
Sample
7-14 working days
Manufacture Process
Mixing—Forming—Sintering—Sizing—After Treatment—Packing—Shipping
Product Image
PM Technology
Powder Metallurgy (Metal compression molding) is the most cost effective of a number
of possible options for making the part.
* Very high and uniform purity can be easily achieved
* the simple fabrication process retains purity
* Grain size is easily controlled
* No deformation is needed to produce directional elongation of grains
* Void density can be controlled
* Objects can be created in any shape
* Shapes can be produced that not be made by any other process
Main PM Materials
PM Materials
refer to MPIF standard 35
No.
class
common grade
1
Iron and Carbon Steel
F-0000
F-0005
F-0008
2
Iron-Copper and Copper Steel
FC-0205
FC-0208
FC-0508
3
Iron-Nickel and Nickel Steel
FN-0205
FN-0208
FN-0405
4
Prealloyed Steel
FL-4205
FL-4605
FL-5208
5
Hybrid Low-Alloy Steel
FLN2C-4005
FLN2-4405
FLNC-4405
6
Sinter-Hardened Steel
FLN2-4408
FLNC-4408
FLC2-4808
7
Diffusion-Alloyed Steel
FD-0205
FD-0405
FLDN2-4908
8
Copper-Infiltrated Iron and Steel
FX-1005
FX-2005
FX-2008
9
Copper and Copper Alloys
CZP-1002
CZ-3000
CT-1000
PM Surface Treatment
- Surface Heat Treatment(Surface carburizing, nitriding, carburizing
and high frequency quenching)
- Black Oxide Finish
- Immersion Oil
- Electroplating
PM Process
Our Factory
Company Name
Shanghai United Metal Materials Co., Ltd
Year Established
2006
Main Product
Metal injection molding, Rare earth magnet, Bonded Neodymium magnet, Sintered Ndfeb magnets, Smco magnet, Hard ferrite ceramic, soft ferrites, Rubber magnets, Die casting.
Certifications
ISO9001, TS16949, ISO14001, GB/T28001
Service
1) Our engineers provide you the better solution for your design. We involve our customers in the development process of their products right from the beginning.
2) We provide effective and prompt customer service, our innovative solutions result in competitive advantages for our customers.
Keep the competitive cost.
3) Keep the competitive cost.
Contact Us
FAQ
1, What is the format of drawings are we using currently?
We need the 2D and 3D drawings commonly, the software that we use are AutoCAD, solid-works, UG, pro-E.
2D: dwg, pdf, jpg,
3D: stp, igs,
2,How to get the exact quotation asap?
2.1 Firstly we need to have the 2D drawings and 3D drawings, in which there are material, detailed dimensions,
geometric tolerances, and other necessary parameters; for magnets, the magnetic characteristics
such as Br, Hcj, Hcb, (BH)max are very necessary.
2.2 the monthly or annual requirement in quantity;
2.3 what is the part/component used for; it means usage.
2.4 surface treatment such as sand blasting, plating, coating…
3,What is the MOQ of order ?
3.1 generally it depends on the shape and the tolerances of part/component,
3.2 MOQ is only for mass production period;
3.3 it is not for the period of development of project;
4. What surface treatment can be used for …
It can be checked on the description page, generally we choose the following treatment,
but if customer need the special treatment, we can provide by our suppliers.
Plating,
E-coating, spray,
electro-polish,
sand blasting,
magnetic polish,
anodic oxidation etc.
5. Can the documents of PPAP(ISIR), FMEA, CP, GR&R, DFM be supplied.
Yes, we can provide this kinds of documents;
6. Lead time, how long is it commonly?
6.1 lead time for tooling/mold/jig: 2-3 weeks generally;
6.2 lead time for making samples: 1-2 weeks generally;