Light Duty Warehouse Storage Rack Shelf Garage Shelves

FOB Price: USD 1000 - 2000
|
- Twenty-Foot Containers (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:T/T, L/C, D/A, D/P, Western Union, PayPal

Quick Details

  • Processing Time:15 Days
  • Port:SHANGHAI
  • Supply Ability: -
  • Brand Name:-
Welcome to Our Company Factory 500KG Per layer Powder Coated Metal Light Duty Warehouse Storage Rack Shelf Garage Shelves We have a broad range of racks for warehouse and supermarket or store, buy all what you need from one company, this one-stop purchasing can save your time and your costs. Products Display Specification Item Omracking Light Duty Shelving Height H1800/2000/2400/2700/3000mm Width 450/500/600/900mm Length L1200/1500/1800/2000/2400mm Load 100-300KG Load Capacity Upright Welded Type 50mm*30mm /75mm*35mm / 80mm*40mm Bolted Type 50mm*30mm/ 75mm*40mm / 80mm*50mm Thickness: 0.8mm-1.2mm Beam 50mm*30mm/ 60mm*40mm/ 80mm*50mm Thickness: 0.5mm-1.2mm Decking Thickness: 0.3mm-0.7mm Features 1. Customized color, size, thickness as per your requirements 2. Quick and easy installation in 10 minutes 3. Metal material, strong and durable 4. Adjustable height of each layer as your needs 5. Suitable for warehouses, homes, kitchens, offices, etc. Specifications can be customised according to actual requirements Packing&Transport Factory Our factory is composed of production department, purchasing department, quality inspection depart- ment, technical department, on-site logistics department, etc., with a total of about 120 production workers and an annual production capacity of about 35,000 tons. FAQ Q: Are you manufacture or trading company? A: We are manufacture. Our factory has been specializing in warehouse racks and different,kinds of display stands since 2007. Q: Where is your factory? Can I visit ? A: Our factory is located in Nanjing,China. You are warmly welcome to visit whenever you are available. Q: What is the term of payment? A: Payment terms: 30% of deposit upon signing the PI, and balance will be cleared by T/T before delivery. Q: What are main rack and add on rack? A: The difference between these two kinds of racks is upright. Main rack is the start rack with 2 uprights and add on rack is the continue rack with only 1 upright. For example, if there are 15 wall racks against the wall, the structure will be 1 main rack+ 14 add on racks.  Q: What is your delivery time? A: Normally is 3-4 weeks after receipt of the deposit.

You May Be Intrested In