Metal Scrap

FOB Price: USD 170 - 230
|
800 Tons (Min. Order)
  • Supplying Ability800 Tons Per Month
  • Supplying TypeOem service
  • Model NumberHMS 1& 2
  • Preferred Payment Method:T/T, D/A, D/P, Western Union

Nouvel Generation

Ghana

Port: Tema

Quick Details

  • Processing Time:2 weeks after yard inspection
  • Port:Tema
  • Supply Ability: 800 Tons Per Month
  • Brand Name:-
Nouvel Generation with full legal and corporate responsibility, that we are ready, willing and able to provide the following product as stated below: COMMODITY: HMS 1&2 QUANTITY: Min 800 MT per month x 12 Months contract, up to 1,000 MT per month ORIGIN/LOADING PORT: Takoradi Ghana, Lagos, Nigeria DESTINATION PORT: C&F to any safe port DELIVERY: Within 20 days of signing a contract AND receiving POF PRICE &TERMS OF PAYMENT: T/T wire transfer,FOB  $175/MT. SPECIFICATIONS: Steel scraps shall be considered free of alloys when the residual alloying elements do not exceed the following Percentage Points: Nickel (0.45)…Chromium (0.20) Molybdenum (0.10)…Manganese (1.65)…The combined residuals shall not exceed a total of (0.60) Percent PAYMENT TERMS: By FOB at loading port as per shipment quantity. PROCEDURE: 1. Seller issues FCO 2. Buyer will provide ICPO (copy entire text of FCO on end buyer’s letter head,stamp and sign) 3. The Seller will issue the DRAFT contract and buyer must amend it and return it to seller via email. 4. Contract must be signed by seller and buyer within FIVE (5) working days. 5. PLEASE NOTE: This offer is time-sensitive. If buyer does not execute and remit this contract agreement to seller within FIVE (5) Working Days, then this agreement is terminated without further notice unless a written permission is received from the buyer. 6. Buyer or Buyer's representative will be allow for yard inspection according to request. 7. Seller and Buyer will agreed on 30% for  cutting,loading and other logistic to move goods for loading to container. Buyer can visit and inspect loading. Seller will order SGS/AHK/Alex certification of quantity and quality at loading port. 70% balance payment has to be done at loading port against inspection and shipping documents. Same process will repeat every month for the entire contract period. Thanks, Kain James .