Table Formwork/Early Stripping Formwork/Slab Formwork/Post Tension Formwork/PT Slab Formwork/ Time Saving Formwork/Simplest Ass

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:T/T, L/C

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Table Formwork  is a fast and safe system for the buildings with early stripping mechanism. Here are the advantages of this system: 1.Fast: one worker can achieve 100m2 one day 2.Long duration: the bamboo plywood could be used 30-50 times 3.Early stripping: after casting and the concrete strength reaches 13MPa, then remove the panels 4.Easy to handle: the worker can learn in a few minutes. 5.Reduce the cost: unlike the local plywood only 5-10 times duration, our formwork system can be used from 30-50 times. The formwork system contains 3 basic components: 1.The panel: Plywood type: Bamboo plywood (Recycle times: At least 30 times) Frame material: Steel Q235, Frame and plywood connected by rivets Surface treatment: Panel Frame Rails Powder Coated Orange Size: Max size 1.8m*1.2m, Min 0.6m*0.6m Weight: Max 43kg/1.8m*1.2m, Min 13kg/0.6m*0.6m If the bamboo plywood is broken, you can remove the rivets and then replace a new plywood. 2.The prop/shoring system: With early stripping head. Steel material, duration more than 5 years; Height 2.2m to 3.5m; Tube Thickness 3mm; With extensions, the prop can reach 5.5m; the load capcity of the prop is showed below: 3.The infill beam for the area around the column, wall, beam etc. Hang on the prop; Available working with traditional formwork,thickness 12mm; Duration more than 3 years. 4.Cantilever and its related items for boundary installation of formwork Projects references