Carbon Steel Boiler Steam Drum 100 Ton Per Month For Power Station

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:-

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Carbon Steel Boiler Steam Drum 100 Ton Per Month for Power Station Boiler drum for separating steam and water Description: A steam drum is a standard feature of a water-tube boiler. It is a reservoir of water/steam at the top end of the water tubes. The drum stores the steam generated in the water tubes and acts as a phase-separator for the steam/water mixture. The difference in densities between hot and cold water helps in the accumulation of the "hotter"-water/and saturated-steam into the steam-drum. The drum is the most important component of the natural circulation boiler.The drum can guarantee the normal water circulation and safety of the boiler. In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes. The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum. Techonical parameter: Product Name Boiler Steam Drum ( Steam Water Separator ) Applied Area Natural circulation boiler Drum Shell Plate Material - Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70 - Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353 Drum Head Material Same as shell Nozzle Tube Material As per design Standard China GB, ASME, EN Manufacturer Grade China A Grade, ABS Certificated, TUV Certificated Working Temperature Saturation Temperature at rated pressure Working Pressure 1.6 MPa ~ 22.5 MPa Shell Plate Thickness (Drum Wall Thickness) ≤150 mm Drum Diameter ≤3,200 mm Drum Length ≤25,000 mm Welding - Shell : SMAW, SAW - Nozzle tube : GTAW (TIG), SMAW Welding NDT - Shell longitudinal seam : 100% RT, 100% UT - Shell circumferential seam : 100% RT, 15% UT - Nozzle tube angle seam : 100% UT, 100% MT   Boiler Mud Drum Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater Name&Type Supply Ability: FOB Price Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price Boiler header 100Ton/Tons per Month Contact Me Get Latest Price Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price Other 300Ton/Tons per Month Contact Me Get Latest Price Boiler Parts Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube Company Introduction Suzhou ORL Power Engineering Co., located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW). Product Description Boiler Parts Boiler Drum Boiler Waterwall Panel Boiler Economizer Boiler Header Boiler Cyclone Separator Boiler Chimney Flue Pipe Boiler Air Preheater Boiler Air Preheater Boiler Parts Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube Production Workshop Boiler Product Production Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop. Testing Center Boiler Product Test Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection Packaging & Shipping Certifications Company Business Our products have been wildly used in power plants and large international companies overseas. Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc. We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.   Trading Process ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you. FAQ 1. Why choose us? We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China. We ensure the deliver time, high quality, and the best after-sale service for you. 2. How to order? Welcome come to our factory for inspecting and discussion the technical details.