Heilongjiang Power Plant Debugging Project

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:-

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Latitude and longitude latitude and longitude in heilongjiang hegang power plant debugging project: heilongjiang hegang power plant located on the outskirts of hegang in southern area of workers and peasants, latitude and longitude is hegang sugar alcohol self-provided power plant of the company. The scale of construction for two furnace machine. Jinan boiler for 35 t/h boiler plant biomass boilers. Form a complete set of power generation equipment factory hangzhou two 3 mw generating unit. Jinwei sugar alcohols are the company's main products, produced with cod through the xylitol. The count of biomass power plant boiler of the main raw material, after extracting the sugar alcohol is cod waste, then according to certain proportion with coal mix mixed, into the boiler combustion. Heilongjiang hegang power plant went into operation in order to ensure the unit, appointing us for electrical debugging. This project set up in 2012, installed in May 2014, in the debugging stage. In June 2014, my company at the request of the owner to send technical personnel to latitude and longitude heilongjiang hegang power plant electrical debugging. At the beginning of the commissioning phase, our commissioning staff met with a lot of problems existing in the installation. We are one by one to solve the debugging personnel. Carefully inspection on the newly installed equipment, inspection on handover testing data to check. Help the owner to find the hidden trouble existing in the installation process, and check the wrong wiring line search. Has completed two sets of the protection of the system debugging, auxiliary power electric debugging system debugging, excitation system commissioning, the same period. A lot of difficulties in the process of debugging, try to overcome, actively complete all debugging. Complete all operation of review and the site operation training for the students, push the project forward smoothly. Is now complete subsystem, before starting the whole debugging. Currently waiting for interconnection formalities, and stepped into the stage of whole start debugging. All goes well, in the process of debugging equipment normal operation, no malfunction and exceptions, obtained the owner's approval and praise.