Quick Details
- Processing Time:-
- Port:AWSP
- Supply Ability: -
- Brand Name:-
Offer; OFFER MANGANESE LUMP ORE
Group Investment Global LLC–offers a wide range of quality MANGANESE LUMP ORE.
Our products are indisputably the best!
Below are the specifications of our product and our trade terms, subject to our
re-confirmation:
COMMODITY: TRIAL OF 5,000 MT +/- 10% MANGANESE LUMP ORE AND CONTRACT OF 12 MONTHS OF 25,000 MT +/- 10% PER MONTH.13 MONTHS ON CONTRACT.WITH ROLL OVER AND EXTENSION. will be shipped by 20 feet containers
(A)"Manganese Ore" means the solid mineral contains Manganese (Mn).
(B) "U.S. Currency" means the currency of the United States of America freely Transferable from and payable to an external
account.
(C) "Metric Ton" means a ton equivalent to 1000 Kilogram.
(D) "Wet basis" means Manganese Ore in its natural wet state
(E) "Dry basis" means Manganese Ore dried at 105 degrees Centigrade
(F) "MT" means Metric Ton, “DMT” means Dry Metric Ton, “WMT” means Wet Metric Ton.
(G) 1% Mn = 1 Unit of Mn Content. 1%Mn
If Mn 44.30%, Units of Mn Content = 44.30.
If Mn 42.21%, Units of Mn Content = 42.21.
The rest may be inferred.
ORIGEN: Kenya
PACKING: IN BULK VESSEL
INSURANCE: TO BE CONTRACTED BY THE SELLER.
FIRST DELIVERY IN THE TERM OF: 45 DAYS AFTER FINAL IRDLC CORFIRMATION BY BANK OF
SELLER OR FIDUCIARY COMPANY.
PAYMENT TERM : 100% IRDLC, Irrevocable,transferable,Divisible,Confirmed,operative.
Unconditional,Assignable,revolving per 13 shipments. The DLC is MT700 confirmed by tops 25 worldwide.
banks.
SHIPMENT INSPECTION: The quantity and quality of goods will be confirmed by
SGS Or CCIC ON SELLER COST ON PORT OF LOADING AND BY BUYER ON PORT OF UNLOADING.
INCONTERM: INCOTERMS 2010
SPECIFICATIONS:
MANGANESE ORE
Specs: Mn 38% min 40%max
Fe 5.00% max
SiO2 22%
Al2O3 8.00% max
P 0.10% max
S 0.10% max
Moisture 10.00% max
Appearance and Size: in lumps, 10-100mm 80% min,10-100mm 90%min
Manganese Ore must be crushed, sieved and shall be free of soils, slags, radioactivity and contaminants.
PROCEDURES:
NON-NEGOTIABLE TERMS TO INITIATE TRANSACTION
1. BUYER send the LOI to Seller.
2. The Seller will issue the SCO for the buyer’s review and acceptance.
3. Buyer issues ICPO to end seller.
4. The Seller forward draft SPA to buyer for amendment and acceptance by seller with full KYC documents including bank details from which LC is issued.
5. Buyer sign sealed and forward back to seller’s signature.
6. Seller issues an indicative Pro-forma Invoice – (OPI) to the Buyer with Past Bill of Lading (BoL)
7. Buyer issues a Documentary Credit (DLC) MT 700 Irrevocable and Confirmed in favor of the seller.
A) Then once the instrument MT700 has been received and confirmed, Seller
within 15 days, the Seller will notify the Shipping Forwarding Company on stock allocation at site and will arrange goods collection schedule,
B) Seller shall send attach copies of export Documents to the buyer for
Preclearance of imports in his jurisdiction.
C) Exports will be done within a period of 35/45 days to destination
Port.
8. Authenticated Shipping documents and inspection assay report from appointed accredited inspection authority at the Loading in
DRC/ Kenya and or the Exit port of loading in Kenya shall be issued by Seller to the Buyer.
9. The goods specified in each and every shipment remain the property of The Seller until full and final settlement has been
received and confirmed by their bankers/financiers.
10. AFTER THE SHIPMENT IS READY ON PORT OF
LOADING, SELLER PROVIDES ALL SHIPMENTS DOCUMENTS AS PER AGREEMENT BETWEEN BUYER AND SELLER.
11. SELLER BANK SENDS COPY FULL SET SCANNED SHIPPING DOCUMENTS TO BUYER BANK FOR FINAL PAYMENT THE BUYER BANK
WILL PAY BY WIRE TRANSFER MT103-72 TO SELLER BANK WITHIN 1 TO 2 BANKING DAYS.
Regards