Quick Details
- Weight:25 kg
- Function:Girder Lower Concrete Form
- Processing Time:45-60 Days
- Port:-
- Supply Ability: 10000 Packs
- Brand Name:HFC Form
H.F.C Eco-friendly Floor formwork
( Certified Innovative product by K-PPS )
It was developed with the goal of drastically reducing costs and stabilizing the quality by
substituting the high-functional composites floor formwork for the PSC girder construction. The H.F.C floor formwork is a plastic eco-friendly formwork that can reduce construction costs, improve
workability as well as reduce logistics and storage costs with the optimized design of the girder type.
Product configuration
Satisfactory bottom width for all girder types
Size(LxBxH), mm
Bottom width(B), mm
Application
Remarks
1000 x 700 x 125
660,680
Road bridge(30M), Railway bridge(25M)
1000 x 740 x 125
720
Road bridge(35M)
1000 x 935 x 125
900
All types of girder
1000 x 1040 x 125
1000
1000 x 1130 x 125
1100
1000 x 1230 x 125
1200
Key features of HFC floor formwork
■ Technical excellence
• Proven excellent mechanical properties, dimensional stability, heat resistance, and
long-term durability based on engineering plastics material
• Performance confirmation by field experiments and technical evaluations by research institutes
■ Excellent cost saving
• Can be used semi-permanently repeatedly
• Reduced material costs by not using square lumbers(less than 3 times)
• Reduced logistics costs by the lighter floor form
■ Better & easier construction
• Easier to install, dismantle, move, and store by standardization and integration
• 40% shorter construction period against conventional way
■ Eco-friendliness
• Recyclable Plastic Formwork
• CO2 reduction by reducing construction time and activating eco-friendly materials
• Minimum environmental destruction(logging) due to non-use of square lumber
H.F.C Eco-friendly Floor formwork
( Certified Innovative product by K-PPS )
Product
HFC ECO-Friendly Floor Formwork
(recently developed as a bed for manufacturing cast in situ PSC girder)
Shape
Major clients
• All government agencies or contractors in charge of bridges
• Sub-contractors or bridge-oriented companies that constructs PSC girders on site
Overview
• The world's first modular floor formwork: The H.F.C floor formwork is a plastic
eco-friendly formwork that developed with the goal of construction safety, quality stability and cost savings for the cast-in-site PSC girder construction.
• By replacing old materials(square lumbers, steel plates) and using H.F.C floor formwork, it is anticipated to achieve cost savings(time and manpower) and better quality
control(stiffness and shear key) and easier application(light weight).
Comparison
Conventional
way
HFC floor
formwork
Layer of lumbers and steel plates(left)
Bad quality & ugly appearance(right)
Simple and easy installation(left)
excellent quality & clean appearance(right)
Advantages
Operation
• Short construction period, safer working condition, better quality control, easier
storage and cheaper logistics
→ Finally SOC budget savings in total
Eco-friendliness
• Recyclable Plastic Formwork & no need to logging for lumbers
• CO2 reduction by shorter working time
Reference
• Many expressway projects of EX such as Anseong-Yongin, Sejong-Anseong
etc.
• Railway bridge in the Pohang Youngilman new port link project (KR)
• Some road bridge projects of LH such as Gwachen route 47 bypass project etc.
• Local government projects such as Gimhae, Andong, Chilgok etc.
※ HFC: High Functional Composite
※ K-PPS: Public Procurement Service of Republic of Korea
Structural stability of H.F.C floor formwork
• Prevention differential settlement due to un-flatness and poor bearing capacity at site
(Prevention of lateral sweep)
• 3 times more contact area, a quarter deflection and 6 times stiffness against conventional method
Comparison with conventional methods
Item
Conventional method
(Square lumber & steel plate)
H.F.C floor formwork
Installation on site
Patent
X
No.10-1614833
Loading test
X
Accomplished at KCL in Oct, 2017
References
thousands of
(for a long term, conventional way)
• Many road and railway bridge projects as below;
• Railway bridge in the Pohang Youngilman new port link project (KR)
• Road bridge in the Honamseon improvement project (KEC)
• Local governments such as Jeonnam, Gangwondo
Technical overview
Square lumbers and steel plates are used to construct the floor formwork of the
cast-in-place girder, but it is difficult to reuse(less than 3 times) and there are problems with quality degradation such as damage to the structure due to deflection and deterioration
of appearance.
The H.F.C floor formwork, developed to solve the problems of conventional methods, is
a plastic eco-friendly formwork that can reduce construction costs, improve workability as well as reduce logistics and storage costs with the optimized design of the girder type.
Work flow
complicated and difficult
Laying of stone powder --> square lumber
(longitudinal, transversal) --> steel plate
simple and easy
Laying of stone powder --> Install floor formwork
Key features
Quality
Sagging of steel plate joints and sagging (swelling) between square lumbers due to
materials with non-uniform stiffness and errors due to non-standardized installation methods
Based on structural stability (optimized design, special material with excellent
stiffness), existing problems are solved, and structural reinforcement and sagging problems are eliminated by applying a shear key
Constructability
Low efficiency due to separate assembly of heavy steel plates and square
lumbers
Can be easily installed, moved, and dismantled as an integrated unit
40% shorter construction period compared to the conventional method
Weight per meter
About 60kg/M
(Heavy to handel)
About 20kg/M (66.7% lighter)
(Light enough to handle)
Cost of logistics
High cost due to heavy steel plate and non-uniform shape(lumber)
Low by low weight and standardized size (80% cheaper than conventional way)
Durability
Lumber: less than 3 times
Steel plate: good
Excellent (Semi-permanent use available)
(high strength and functional composite material)
Eco-friendliness
Lumber waste and continuous logging needs
Re-usable and reducing CO2
Cost
70USD/m x 100% = 70USD/m
(average cost in the market)
80USD/m x 82% (bid rate) = 65.6USD/m
(Roughly 8% cheaper)