Complex Parial Box Girder

FOB Price: Get Latest Price
|
1 Units (Min. Order)
  • Supplying Ability999999 Units
  • Supplying TypeOem service
  • Model NumberCPB
  • Preferred Payment Method:Other

GobizKorea

South Korea

Port: -

Quick Details

  • Processing Time:90 Days
  • Port:-
  • Supply Ability: 999999 Units
  • Place of Origin:South Korea
  • Model Number:CPB
  • Material:Steel
  • Brand Name:DaeYoung Engineering Steel Industry
  • Brand Name:DaeYoung Engineering Steel Industry
Complex Parial Box Girder Overview ⦁ The complex partial box girder (CPB) method is a composite girder method in which I-type girder with excellent bending rigidity is applied to the center and concrete is placed on the top of the lower flange of the BOX-type girder with excellent twisting rigidity at the pier point to increase structural rigidity and reduce the amount of steel. Characteristics of Complex Partial Box Girder ⦁ The complex partial box girder (CPB) method compensates for the shortcomings of steel that is vulnerable to compression by forming a plate girder-shaped cross-section in the center of the span and applying a double composite cross-section with concrete, a material that is highly resistant to compression. ⦁ In the center of the span, an I-shaped cross-section with excellent resistance to bending was added to the cross-section to compensate for the shortcomings of the tendency to be over-designed when designing with a steel box girder to enable efficient design. Accordingly, it is a new type of method that can reduce the weight by reducing the amount of steel in the center of the span when applying the curved bridge..