Quick Details
- Processing Time:90 Days
- Port:-
- Supply Ability: 999999 Units
- Place of Origin:South Korea
- Model Number:CPB
- Material:Steel
- Brand Name:DaeYoung Engineering Steel Industry
- Brand Name:DaeYoung Engineering Steel Industry
Complex Parial Box Girder
Overview
⦁ The complex
partial box girder (CPB) method is a composite girder method in which I-type girder with excellent bending rigidity is applied to the center and concrete is placed on the top of the lower flange
of the BOX-type girder with excellent twisting rigidity at the pier point to increase structural rigidity and reduce the amount of steel.
Characteristics of Complex Partial Box Girder
⦁ The complex
partial box girder (CPB) method compensates for the shortcomings of steel that is vulnerable to compression by forming a plate girder-shaped cross-section in the center of the span and applying a
double composite cross-section with concrete, a material that is highly resistant to compression.
⦁ In the center of the span, an I-shaped cross-section with excellent resistance to bending was added to the cross-section to compensate for the shortcomings of the tendency to be over-designed
when designing with a steel box girder to enable efficient design. Accordingly, it is a new type of method that can reduce the weight by reducing the amount of steel in the center of the span
when applying the curved bridge..