Quick Details
- color:yellow or light yellow
- name:gelatine
- form:granule or powder
- supplier:shanghai lanpu international trade co.,ltd
- bloom:150bloom~260bloom
- Packaging:25kg/bag
- Shipment Delivery Time:about two weeks
- Primary Business:gelatin manufacturer
- Processing Time:About 2 weeks after receiving the payment
- Port:shanghai ,china
- Supply Ability: 3000 Metric Tons Per Year
- Brand Name:Lanpu gelatin
EDIBLE GELATIN :
Edible Gelatin is extremely important food additives, using its stability, foaming, freezing, emulsifying, thickening, regulating the crystal growth, adhesion, clarification
performance, cheese, dairy products, meat products, canned , sausage, jelly, candy, pastries, cold drink and catering and other food industries.
COMPANY PROFILE:
we are a gelatin maufacturer in china and focus on industry gelatin over 23 years .our factory established in 1996.
we are a family business 2 branches ,Alashankou Lanpu Gelatin Factory&Shanghai Lanpu International Trade Co.,Ltd .
Our factory is located in Alashankou ,Xinjiang province , are the first edible gelatin manufacturer in Xinjiang province ,China .
we also have a office and warehouse located in shanghai ,china.
PRODUCTION OVERFLOW:
SPECIFICATION:
PARAMETERS
UNITS
STANDARD
TEST RESULT
Physical items
Jelly Strength
6.67% 10 ℃
Bloom g
180 +/- 5
183
Viscosity
6.67% 60 ℃
mPas
2.2-4.2
4.0
PH Value
---
4.7--7.0
6.8
Moisture Content
%
≤14.0
12.9
Ashes Content
%
≤2.0
1.1
Transparency
mm
≥100
450
Insoluble Particles
%
≤0.20
<0.01
Particle Size
mesh
4--40
8
Colour
---
Yellow or light yellow
yellow
Chemical Items
Sulfur dioxide(SO2)
mg/kg
≤30
9.0
Peroxides (as H2O2)
mg/kg
≤10
1.0
Arsenic (As)
mg/kg
≤1.0
0.05
Chromium
mg/kg
≤10.0
1.8
Microbial Items
Total Bacteria Count
in 1 g
≤1000
<10
Coliform
cfu/gm
≤3
<3
E.Coli
in 1kg
NEGATIVE
Absence
Salmonella
in 25kg
NEGATIVE
Absence
FAQ
Q:What's the Minimum Order Quantity?
A:1000 kg
Q: How to Get Sample?
A: Sample within 200g could be sent for free once buyer’s FedEx account is advised for freight collect or courier cost is paid.
The courier cost could be deducted when bulk order is placed.
Q: What is Lead Time?
A: Generally, cargo could be loaded on ship in about two weeks after the date of receiving prepayment or L/C. Sometimes one week earlier or later.