HOT SALE GLOW IN THE DARK POWDER PAINT FOR CONCRETE

FOB Price: Get Latest Price
|
1 Tons (Min. Order)
  • Supplying Ability-
  • Model Number-
  • Preferred Payment Method:-

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Product Description BAISC INFORMATION A. Product Name High Reflective Thermoplastic Road Marking Paint B. Use For Concrete and asphalt floor C. Components C5 Petropols, EVA, PE wax, titanium dioxide, filler materials… D. Appearance Powder E. Standard JT/T280-2004 F. Color White and yellow (OEM) G. Weight 25kg/bag H. Density 2.01/ cm³ I. Film Thickness 1.8-2.0mm PHYSICAL CHARACTERISTICS A. Compression Strength 23.8MPa B. Fluidity 38 C. Abrasion Resistance 56.8 D. Glass Beads 22.9% E. Softening Temperature 104°C F. Heating Temperature 180-200°C G. Drying Time After Marking Touch dry—3 mins Full dry—10 mins H. Shelf Life Up to 24 months I. Storage Store in a tightly sealed container in a cool & dry place J. Area Of Line 1 Ton thermoplastic paint can mark about 225 m2 FEATURES A. High usage ratio B. Save the cost of gas C. Excellent durability D. Strong adhesion power E. High dirty pick-up resistance F. Bright-color and not faded easily marking line RECOMMENDATION A. Equipment Pre-heater Thermoplastic road marking machine Primer sprayer Road blower Road sprayer B. Dosage Ratio Thermoplastic paint: 1Ton Primer: 32KG Glass beads: 100KG PROCESS A. Clean Clean intended application area thorough B. Layout Outline the area where the marking will be placed using titanium dioxide C. Apply primer Apply the appropriate amount of primer needed for the surface D. Melt Heat paint to be melted using pre-heater E. Position A Pour melted paint into big container of road marking machine Position B Pour glass beads into small container of road marking machine F. Mark Mark thermoplastic line using road marking machine G. Cool Thermoplastic line will cool within a period of time ATTENTION A. Ensure road surface is stable, dry and clean B. It is better to apply above 0°C C. Heating paint in the pre-heater should be between 180-200 °C D. Lift the heating temperature properly when working in a low temperature environment E. Mixing the melted paint evenly and keeping it warm for 3-5 mins before marking the road F. Allow primer to dry before applying paint G. Primer is applied a few wider than the width of the thermoplastic line H. New asphalt and concrete must be allowed to cure for a minimum of 30 days before applying paint