Quick Details
- Processing Time:65-120days
- Port:Shenzhen
- Supply Ability: -
- Brand Name:-
TZ1600-30
Single-Coating Aluminium Coating Line
Coating line
features:
This is an economic type of
coating line apply to most ACP top/bottom coil coating. Product thickness 0.1mm~0.5mm is common used for ACP. This coating line can also produce some gauges of roofing coils. With a
rewinding line, this coating line meets basic requirements from raw material to finished product of coating factory. The line requires a minimum 70m×12m×7m workshop dimension, which suits
most factories in limited dimension.
Application: For
coating top coil and bottom coil of ACP(Aluminium Composite Panel)Advantage: Economical and easy to
use, small dimension workshop needed
1. Main parameters of
coating line
Material parameter
Thickness:
0.1~0.5mm
Width:
1600mm
Outer diameter OD(max):
Φ1400mm
Inner diameter:
Φ150mm, Φ405mm
Bobbin material:
Steel or paper
Inverval-layers deviation
tolerence:
≤0.8 mm (Excluding the bottom 5 layers
and exterior 2 layers)
Coil over-all deviation
tolerence:
≤2 mm (Excluding the bottom 5 layers
and exterior 2 layers)
Coating thicknes:
Dry film thickness: 8~20 um
Product Weight:
Max 4000kg(Excluding bobbin)
CCL Processing
Speed: 30 m/min (Speed benchmark: thickness 0.25mm coil exclude PVDF coating)
Heating Energy
Source: LNG, LPG
Roller coating
Process: Continuous 1 side 1 coating & baking
Properties and
features:
Roller width:
1800mm
Coils feeding centering
adjustment :
±75mm
Threading speed:
5~15m/min(Adjustable)
Line maximum speed:
30m/min
Line speed accuracy:
Steady Speed, ±0.1%;Acceleration,
±0.4%
Uncoiling tension range:
160~700kgf
Processing tension range:
160~700kgf
Coiling tension range:
320~1200kgf
Tension accuracy:
Steady Speed, ±1.0%; Acceleration,
±2.0%
Line space dimensions:
55000mm×7.500mm×6000mm
Heating Energy Source:
LNG, LPG
2. Basic Production Process
Coil loading
→ Uncoil machine → Pretreatment (Including Degreasing, Roller brushing device, drying) → Chromizing → Drying → Re-direction → Topside roller-coating
→ Curing oven → Cooling → Tension machine → Recoiler → Coil discharging
3. Main devices list
Name
Quantity
Coil loading device
1
Sewing table
1
Pretreatment line
1
3M water drying device
1
Chromizing Coater
1
Chromizing drying device
1
Coater
1
Curing Oven
1
Heating system
4
Air cooling devices
1
3-rollers cooling device
1
Tension device
1
Recoil machine
1
Electrical system
1
Rewinding line
1
Coil loading machine
1
Tension device
1
Coil discharging machine
1
*Optional configuration:
waste gas treatment and energy recycle system.
4. Water and power
consumption of coating line
Total power consumption:
80KW
Compressed air:
Min5.5bar,1Nm3/min, actual consumption 0.5Nm3/min
Water:
Deionized water, supply quantity
is about 4T/h
Heating fuel:
LPG or LNG
LPG consumption:
0.2 CBM/min
LNG consumption:
0.5 CBM/min
5. The
coating line project design and manufacture
leads 90 days, installation and testing leads 60 days. 6.Trade terms: FOB, CIF are
available7.Payment terms: T/T, D/P, LC are
acceptable8. Packing style: Wooden
pallet9. Transportation: by sea