Q355B Steel Material SC200 / SC200 Construction Passenger Hoist

FOB Price: Get Latest Price
|
- (Min. Order)
  • Supplying Ability-
  • Supplying TypeOem service
  • Model Number-
  • Preferred Payment Method:-

Quick Details

  • Processing Time:-
  • Port:-
  • Supply Ability: -
  • Brand Name:-
Construciton Site Hoist SC200/SC200 Rack and Pinion Type Lifter KP-B07, KP-B08  Standard Configuration There is a small crane for conenient assembly of the construction lift. Available in single or twin hoist cage configuration. The Variable Frequency Drive (VFD) construction elevator are with low starting current and much less wear and tear, very smooth starting and stopping. There is LED lighting inside construction elevator car. Lighting inside construction elevator car is LED ceiling lamp The construction material hoist cage roof doors are equipped with Interlock. Equipped with hoist drop test facility with remote control. A frequency control unit (FC), with closed-loop, be equipped. Optional Configuration * Rack and pinion elevator cage flap door as loading/unloading ramp. * Elevator car 'C' door for convenient loading/unloading. * Sliding Contact Line (Integrated Conductive Rail or Busbar) specially for rack and pinion lifts. Technical Data  Item Construciton Site SC200/SC200 Rack & Pinion Lift KP-B07, KP-B08 Payload Capacity 2000 kg Lifting Speed 0–46 m/min Max. Lifting Height 450 m Cage Width (internal) 1.5 m Cage Length (internal) 3.2 m  Cage Height (internal) 2.35 m Motor Control Frequency Control Engine Power 2x15 kw Gearbox Helical Gearbox of KANGBO Make Safety Device Centrifugal Brake Power Supply Range 380–500 V, 50 or 60 Hz, 3 phase Mast Section Square column 650*650*1508 mm with bolted rack Rack Module 8 * Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer.