Quick Details
- Processing Time:15-20 days after payment
- Port:Tianjin,Shanghai
- Supply Ability: 35000 Square Meters Per Month
- Brand Name:FYT
Chlorinated Polyethylene
Membrane for High Speed Rail
The chlorinated polyethylene
waterproofing membrane is a colorful elastic waterproof material made of chlorinated polyethylene resin as the base material.
Product Description
The chlorinated polyethylene
waterproofing membrane(CPE waterproof membrane) is a colorful elastic waterproof material made of chlorinated polyethylene resin as the base material, mixed with chemical additives
and fillers, and processed by plastic refining, hot compounding, calendering, crimping, and other processes. The product divides into N class homogeneous and L class fiber conforming.
The main material of
chlorinated polyethylene, no double bond in its macromolecular structure, has good aging resistance, oil resistance, and chemical resistance;blending with rubber, high elasticity, high
elongation, and good low-temperature resistance, and has strong adaptability to foundation settlement and concrete shrinkage joints.From this aspect, chlorinated
polyethylene rubber blended waterproofing membrane has the dual characteristics of chlorinated polyethylene and rubber, is a better waterproof membrane for high speed rail.
Features of Waterproof
Membrane for High Speed Rail:
1. High tensile strength,
strong seepage resistance, good low-temperature flexibility, small expansion coefficient, strong adaptability to deformation, big coefficient of friction, can be used with a variety of adhesives,
good bonding effect;2. Aging resistance, long service
life;3. It can directly construct on freshly
cast concrete, which can effectively shorten the construction period and save the construction cost.
Cautions:
①Configured paint should use
up within 20 mins, with the allocation.②Rainy days, snowy days, more than five
winds, the temperature is higher than 35 ℃ or lower than 5 ℃ is not suitable for construction.③Pay attention to ventilation when
storing and transporting, avoid direct sunlight, and prohibit direct contact with acid, alkali, oil, and chemical solvent. Place in a cool and dry place, suitable temperature -15℃~35℃. The
storage period is 12 months.
Construction
Method:
①Preparation: clean up the
oil, slick, cement slag, loose layer, etc. On the base surface, treat and repair the unevenness; do waterproofing reinforcement layer on specific parts first before large area
construction.②Construction: paste waterproofing
materials with polyurethane or cement-based adhesive. Side painting binder while paving waterproofing materials, while scraping board in the upper part of the coil back and forth scraping solid,
forbidden to have bulging, blistering and other phenomena, polyurethane waterproofing coating or cementitious adhesive for sealing.
Get a free quotation about waterproof membrane
for high speed rail