Lead Ore

FOB Price: USD 250 - 750
|
500 Metric Tons (Min. Order)
  • Supplying Ability500 Metric Tons Per Month
  • Supplying TypeIn stock
  • Model Number-
  • Preferred Payment Method:T/T, L/C

Auric gold resources int'l ltd

Nigeria

Port: Apapa

Quick Details

  • Processing Time:14 days
  • Port:Apapa
  • Supply Ability: 500 Metric Tons Per Month
  • Moisture (%):1
  • Pb (Min):20%
  • Place of Origin:Nigeria
  • Brand Name:-
1 FOB  20% - 29.99% = $10.5 per Pb%               30% - 39.99% = $12.5 per Pb%              40% - 44.99% = $13 per Pb%             44% - 49.99% = $13.5 per Pb%             50% - 54.99% = $14 per Pb%             55% - 59.99% = $14.5 per Pb%             60% - 64.99% = $15 per Pb%             65% + = $16 per Pb%. 2 lead ore content  need above 40%. 3  LC paid 95% at sight of loading documents and balance 5% after CIQ test at destination port. 4 Trial shipment: 100MT Send us a draft of contract. Regards