1. Net 35MW of electricity 2. Boiler to handle 30 tonnes of Dry (less than 10% MC) Baled agricultural waste per hour 3. 2 x 17.5 MW turbines should be considered ***** with 1, 000, 000 lbs of steam per day going to manufacturing process 5. Exhaust air cleaning system should be considered 6. Entire plant foot print (land area occupied should be considered) 7. Mechanised semi automatic feed system should be considered 8. Please give the costs in USD Show More