Join today and be a part of the fastest growing B2B Network Join Now

JP54, D2, D6, Mazut. 10ppm, 50ppm

  • Origin: Russia
  • Supply Type: oem service
  • Processing Time: 10-20 days
  • Min Order: 500.000

Supplier Info.

  • Employees Total 101-200
  • Annual Revenue Above US$100 Million

When oil or gas is encountered, the first step is to feed a pipe into the well. The oil or gas rises to the surface through this tubing. Equipment to shut in the well and regulate the flow (Christmas tree) is mounted at the surface.There are several well completion systems. The purpose of a well completion is to connect the hydrocarbons producing reservoir to the surface so that fluids can be produced. One of the most common completion system is the cemented and perforated casing completion which has a casing (piece of pipe) across the production zone, which is cemented and perforated to allow production. The perforation gun can make up to 40 perforations per meter with diameters of up to 2 centimeters in the casing. The oil or gas enters the well through the perforations and rises to the surface through the tubing.

Premium Services
Need Free Quotes
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok