Motor brand | Siemens |
Control system | PLC |
Color | As request |
After sale service | Long term |
Warranty | 1 year |
Condition | New |
Flotation Equipment Iron Ore Beneficiation Plant Cost
Our Product
Introduction of Flotation Equipment Iron Ore Beneficiation Plant Cost
The impeller has a double-sided blade with backward tilting, which can realize double circulation of slurry in the tank; the gap between the impeller and the cover plate is large, and the air intake is large; the circumferential speed of the impeller is low, and the life of the wearing parts is long; the forward incove body has a small dead angle , foam movement speed; large inspiratory capacity, low energy consumption; long life of wearing parts; conducive to coarse-grain mineral flotation; mechanical agitation, self-priming, self-priming slurry
Technology Data of Flotation Equipment Iron Ore Beneficiation Plant Cost
Model | volume(m3) | processing power(m3/min) | impeller diameter(mm) | impeller speed(r/min) | main motor power(kW) | Scraper motor power (kW) | tank weight(T/slot) |
SF0.37 | 0.37 | 0.2-0.4 | 300 | 442 | 1.5 | 1.1 | 0.45 |
SF0.7 | 0.7 | 0.3-1 | 350 | 400 | 3 | 1.1 | 0.9 |
SF1.2 | 1.2 | 0.6-1.2 | 450 | 312 | 5.5 | 1.1 | 1.4 |
SF2.8 | 2.8 | 1.5-3.5 | 550 | 268 | 11 | 1.1 | 2.2 |
SF4 | 4 | 2-4 | 650 | 235 | 15 | 1.5 | 2.6 |
SF8 | 8 | 4-8 | 760 | 191 | 30 | 1.5 | 4.3 |
SF16 | 16 | 5-16 | 850 | 190 | 45 | 1.5 | 7.4 |
SF20 | 20 | 5-20 | 730 | 186 | 30*2 | 1.5 | 9.8 |
(part data of our magnetic separator, more information welcome to us)
Working principle of Flotation Equipment Iron Ore Beneficiation Plant Cost
The working principle of the SF flotation separator, when the impeller rotates, the slurry in the upper and lower impeller chambers generates centrifugal force under the action of the upper and lower blades and is twisted to the periry, so that a negative pressure zone is formed in the upper and lower impeller chambers. At the same time, the slurry in the upper part of the cover plate is sucked into the upper impeller cavity through the circulation hole on the cover plate to form a slurry circulation. When the lower blade pulls out the slurry around, the lower slurry is replenished to the center, thus forming a lower circulation of the slurry. The air is sucked into the upper impeller chamber through the suction pipe and the central cylinder, and is mixed with the sucked slurry to form a large of fine bubbles, which are uniformly dispersed in the groove through the cover plate to form mineralized bubbles. The mineralized bubbles float up to the foam layer and are scraped off by the scraper to form a foam product.
Our Service
Pre-Sales Service
â¥Onractive service
â¥Offractive service
â¥Solution design service
â¥Visit reception service
After-Sales Service
â¥Installation and debugging service
â¥Training service
â¥Other more service(Clients have any needs or problems; our engineer can take plane and get the worksite to provide service in 8 hours.)
Packing&Shipping
Our Certification
FAQ
1. Quality control
All the equipment offered by Shanghai Clirik Machinery Co., Ltd. are produced by China national standard drawings, nonstandard equipment will be produced by the drawings confirmed by clients. Clirik Machinery strictly follows ISO 9001: 2008 Quality management system. Most equipment will be test for at least 8 hours in the factory before delivery. There is record in computer for each equipment, spares can be easily confirmed when it is necessary.2. Way of paymentWelcome clients place the order by alibaba ontouch! Deya also offers various ways of payment, T/T, against copy of B/L, L/C, D/A, D/P, West union, etc. All can be negotiated.3. Delivery timeNormal delivery time within 10 to 20 working days, complete production arger equipment may take longer. Exact delivery shall be confirmed when place the order.4. Trade termsTypically EXW, FOB, CIF, CFR, DAF follows International Rules for the Interpretation of Trade Terms 2010(INCOTERMS 2010).(you are also welcome to take the rule of Alibaba Trade Assurance)5. Shipping Priority rule based on clients' request, and freight cost, service, shipping date, date of arrival shall be considered.6. InstallationClirik has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for techniciansâ round way air tickets, salary(shall be confirmed before leaving), food and lodging, most importantly to guarantee the techniciansâ safety.7. Equipment warrantyEquipment from Shanghai Clirik Machinery Co., Ltd. with 18 months warranty, can be extended to 12 months as request.
Shanghai Clirik Machinery